60 MW Bandirma Wind Power Plant Project
Score Breakdown
Integrity
verified Additionality was confirmed by the VVB under an investment test, which supports the project’s core eligibility.
missing Leakage is marked as not addressed in the latest verification report, and reversal handling is also not addressed.
Transparency
verified The project has a named verifier, Applus+ Certification, and a defined monitoring period in the 2025 verification report.
missing The extracted record does not show claimed versus verified ER totals, and key monitoring methods such as usage monitoring and FNRB are not stated.
Claim Safety
verified The project is a wind project using ACM0002 with a project baseline, which is generally lower risk than more discretionary baseline approaches.
missing The latest report contains unresolved leakage and reversal questions, and the project is marked CORSIA-eligible, which keeps dual-claim risk elevated.
Documentation
verified The record includes a recent verification report, a named VVB, and a large number of extracted facts across official documents.
missing Extraction confidence is low, and the verification report lists many CARs and CRs plus missing monitoring details, indicating incomplete documentation.
Detailed Analysis
Integrity
The project has a meaningful positive signal because the verification report confirms additionality through an investment test and names Applus+ Certification as the VVB. However, the latest report also says leakage is not addressed and reversal events are not addressed, while the material findings and corrective actions show multiple unresolved monitoring and reporting issues. I therefore score integrity below average despite the renewable-energy context.
Transparency
Transparency is weakened by missing core MRV fields in the extracted record, including no stated usage monitoring method, no verified or claimed ER totals, and no FNRB information. The monitoring period is clear and the verifier is identified, but the report also contains many corrective actions for missing records and calculations. The low extraction confidence further reduces confidence in the completeness of the public record.
Claim Safety
Claim safety is moderate at best because the project uses a standard wind methodology and a project baseline, which is generally a defensible setup. Still, the latest verification report leaves leakage unresolved, and the record is inconsistent on reversal handling and crediting-period timing. Because the project is marked CORSIA-eligible and CCP status is not stated, dual-claim risk is not fully excluded.
Documentation
Documentation quality is limited by low extraction confidence and by the fact that the latest verification report lists numerous CARs and CRs, including missing sustainability monitoring parameters, meter evidence, and SDG calculations. The project does have a recent verification report and a named VVB, but the record does not show a complete, clean evidence trail. The contradiction on the crediting period also suggests the documentation set is not fully harmonized.
Overall
I privileged the latest verification report dated 2025-01-02 for leakage, reversal status, and documentation quality because it is the most recent and specific source, even though an earlier report said leakage was negligible and none reported. I also privileged the later crediting-period statement in the extracted record, but the contradiction with the earlier period indicates the record is not fully consistent and lowers confidence. Given the many unresolved CARs/CRs, low extraction confidence, and missing MRV fields, the project looks plausible but not high quality from a claims perspective.
Audit Analysis
This is a wind project with VVB-confirmed additionality and a recent verification report, but the evidence set shows several documentation gaps and unresolved issues around leakage, reversals, and monitoring completeness. The project appears operationally credible, yet the record quality is uneven and the contradictions reduce confidence in the claimed emissions reductions.
Project Description
Developer: BORUSAN ENBW ENERJI YATIRIMLARI VE ÜRETIM A.S. Type: Wind Size: Large Scale Methodology: ACM0002 Grid-connected electricity generation from renewable sources Crediting period: 2015-07-24 → 2029-07-23 Estimated annual credits: 108692 tCO2e SDGs: Goal 13: Climate Action, Goal 8: Decent Work and Economic Growth, Goal 6: Clean Water and Sanitation, Goal 7: Affordable and Clean Energy
Red Flags
- Leakage is not addressed in the latest verification record, despite an earlier document saying it was negligible.
- The latest report lists many corrective actions and material findings, including missing monitoring records and SDG-related calculations.
- The crediting period and reversal status are inconsistent across documents, which weakens reliability.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2015 | 50,830 | 50,830 | 0 | |
| 2016 | 123,310 | 123,310 | 0 | |
| 2017 | 112,511 | 94,690 | 17,821 | |
| 2018 | 117,354 | 86,368 | 30,986 | |
| 2019 | 119,902 | 19,902 | 100,000 | |
| 2020 | 119,700 | 100,591 | 19,109 | |
| 2021 | 116,038 | 87,654 | 28,384 | |
| 2022 | 123,631 | 0 | 123,631 | |
| 2023 | 126,725 | 28,706 | 98,019 | |
| Total | 1,010,001 | 592,051 | 417,950 |
Cosa migliorerebbe questo punteggio
- Provide a complete, reconciled monitoring package with verified and claimed ER totals, meter evidence, and all sustainability parameters.
- Resolve the leakage, reversal, and crediting-period contradictions with a single authoritative statement from the latest registry and verification documents.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed investment test
No reversal treatment stated
Latest report does not address leakage
Project baseline with reassessment timing unclear
FPIC and grievance mechanism present
CORSIA-eligible; CCP status not stated
Where to buy
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Registry Documents
monitoring
- T-PerfCert_V2.0-Project-Annual-Report-Form_Bandırma WPP.pdf
- 430_V1.3_IQ_SDG-Impact-tool_Bandirma WPP CP1.xlsx
- Final_ER Calculations_Bandırma WPP_v02_22-07-2022.xlsx
- Final_MR_Bandirma WPP_v05_12-12-2024 clean.pdf
- Bandırma WPP_Transition-Annex_v3_20200224_clean.docx
- Final_Ver Report_Bandirma WPP_v01.2_09-01-2024.pdf
- +15 more
Other
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti