Registry document
Monitoring Report_1st monitoring period_22.11.2016 to 23.08.2017_v3
Published by Gold Standard for this project. CarbonMeld stores a copy as retrieved from the registry: the document is the registry's, not ours.
- Project
- Adavikanda, Kuruwita Division Mini Hydro Power Project (GS-1060)
- Document type
- Monitoring Report
- Registry
- Gold Standard
- Retrieved from the registry
- File
- Monitoring Report_1st monitoring period_22.11.2016 to 23.08.2017_v3.pdf
Open the PDFRegistry record of the project ↗
AnalysisScore 6.1/10Re-assessment pending
See CarbonMeld's analysis of this project →