Skip to main content
CarbonMeld CarbonMeld Carbon Observatory

Registry document

111215_Monitoring Report_Dora-1GPP_3rd Verification_kka_V3

Published by Verra for this project. CarbonMeld stores a copy as retrieved from the registry: the document is the registry's, not ours.

Project
Aydin Salavatli Dora-1 Geothermal Power Plant (VCS-120)
Document type
Monitoring Report
Registry
Verra
Retrieved from the registry
File
111215_Monitoring Report_Dora-1GPP_3rd Verification_kka_V3.pdf

Open the PDFRegistry record of the project ↗

AnalysisDocument-based rating 3.2/10Re-assessment pending

See CarbonMeld's analysis of this project →

Cite this document

Verra. 111215_Monitoring Report_Dora-1GPP_3rd Verification_kka_V3 (Monitoring Report), Aydin Salavatli Dora-1 Geothermal Power Plant (VCS-120). CarbonMeld copy, retrieved from the registry on 3 Sep 2026: https://carbonmeld.com/projects/docs/aydin-salavatli-dora-1-geothermal-power-plant-d259dd/5b5337bc2e80b01c/.

Please cite or link this page rather than the PDF file: it shows where the document comes from and links to the project's page.