VCS Energy industries (renewable/non-renewable sources) Turkey Registry: Registered Documentazione completa General Methodology v2.0

Aydin Salavatli Dora-1 Geothermal Power Plant

VCS-120 ↗

5.5 / 10
Integrity
5.8
Transparency
5.2
Claim Safety
4.9
Documentation
6.1

Score Breakdown

Integrity

verified Additionality was confirmed by the VVB using an investment test in the validation report, and no material findings were reported.

missing The monitoring report states the 2017 baseline emission was wrongly calculated and requires correction, and leakage treatment is only described as negligible.

Transparency

verified The project has multiple official documents available, including validation, monitoring, PDD, and issuance records, with a high extraction confidence.

missing The monitoring report lacks key meter specifications and does not provide a verified usage monitoring method or a quantified leakage deduction.

Claim Safety

verified The project is not CORSIA-eligible, which reduces one channel of dual-claim risk.

missing The monitoring report shows a corrected baseline calculation issue and the claimed and verified ER totals are tied to a disputed calculation history.

Documentation

verified The record includes 43 documents and the extraction confidence is high, supporting a reasonably complete evidence base.

missing The monitoring report still requires supplementation on meter details and comparison of actual versus estimated emission reductions, indicating documentation gaps.

Detailed Analysis

Integrity

The validation report confirms additionality through an investment test, while the monitoring report reports no material findings. That said, the monitoring report also says the 2017 baseline emission was wrongly calculated and must be corrected, which weakens confidence in the baseline and the credited volume. Leakage is only justified as negligible, with no quantified deduction, and reversal risk is not addressed in the extracted record.

Transparency

The project has a substantial document set, including validation, monitoring, PDD, and issuance records, and the extraction confidence is high. Even so, the monitoring report does not state the electricity meter installation details, serial number, model, calibration entity, or validity dates, and the usage monitoring method is not found in the extracted record. The verified and claimed ER totals match in the latest monitoring report, but the earlier calculation discrepancy still reduces transparency.

Claim Safety

Claim safety is weakened by the monitoring report’s admission that the 2017 baseline emission was wrongly calculated, because that points to possible over-crediting. The project is not CORSIA-eligible, which helps reduce dual-market claim risk, but there is no CCP status in the extracted record. Leakage is treated as negligible rather than quantified, so the overall over-claim risk remains moderate.

Documentation

Documentation is fairly strong because 43 documents were used and the extraction confidence is high. The latest monitoring report and validation report are available, but the record still shows missing meter specifications and a need to compare actual versus estimated emission reductions. The crediting period is long and the monitoring period is recent, which helps, but the unresolved correction request lowers the score.

Overall

I privileged the 2023 monitoring report and 2023 validation report over older documents because they are more recent and more specific to the latest issuance period. Where contradictions exist, I treated them as reliability issues rather than ignoring them: the additionality test is best read as investment-test based because that is the VVB-confirmed validation finding, while the baseline and ER totals are less secure because the monitoring report explicitly says the 2017 baseline calculation was wrong. The project therefore looks viable but not high-confidence, with the main concerns being baseline accuracy, leakage treatment, and incomplete monitoring detail.

Audit Analysis

This is a registered VCS geothermal project with VVB-verified additionality and no material findings reported, which supports moderate integrity. However, the monitoring report includes a corrected baseline calculation issue, missing meter details, and unresolved leakage and reversal treatment, which weakens confidence in the claimed reductions.

Project Description

Proponent: Menderes Geothermal Elektrik Uretim A.S Protocol categories: Energy industries (renewable/non-renewable sources) Protocols: AMS-I.D. Estimated annual GHG reductions: 30309 tCO2e Region: Middle East Registration date: 2023-03-09

Red Flags

  • The monitoring report says the 2017 baseline emission was wrongly calculated and needs correction, which raises over-crediting risk.
  • Leakage is only described as negligible, with no quantified deduction, and reversal risk is not addressed.

Credit Vintages

Issued Retired Available
2008
14,526 14,526 0
2009
30,291 30,291 0
2010
28,282 28,282 0
2011
27,884 27,884 0
2012
24,404 23,344 1,060
2013
26,514 26,514 0
2014
27,454 27,454 0
2015
26,881 26,881 0
2016
24,579 24,579 0
2017
9,639 9,639 0
2018
9,180 9,180 0
2019
6,563 6,563 0
2020
10,691 10,691 0
2021
8,610 8,610 0
Total 275,498 274,438 1,060

Cosa migliorerebbe questo punteggio

  • Provide a corrected monitoring calculation with a clear reconciliation of the baseline emission error and the final verified ER amount.
  • Add complete meter specifications, calibration evidence, and a quantified leakage assessment with explicit treatment of reversal risk.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

reversal risk not addressed

Leakage

negligible claim without quantified deduction

Baseline

baseline method present but calculation corrected

Safeguards

grievance mechanism present, FPIC not conducted

Double-claim

not CORSIA-eligible, CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-15 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti