Skip to main content
CarbonMeld CarbonMeld Carbon Observatory

Registry document

02-Tianwanggou_VCS Verification Report_20151230-20180619_V1.2

Published by Verra for this project. CarbonMeld stores a copy as retrieved from the registry: the document is the registry's, not ours.

Project
Datong River Tianwanggou Hydropower Station (VCS-823)
Document type
Verification Report
Registry
Verra
Retrieved from the registry
File
02-Tianwanggou_VCS Verification Report_20151230-20180619_V1.2.pdf

Open the PDFRegistry record of the project ↗

AnalysisScore 6.2/10Scored

See CarbonMeld's analysis of this project →