Datong River Tianwanggou Hydropower Station
Score Breakdown
Integrity
verified Additionality was confirmed by the VVB using an investment test (monitoring report, 2021).
missing Multiple material findings/corrective actions indicate inconsistencies in core project descriptions and crediting-period definition (monitoring report, 2021).
Transparency
verified Claimed and verified ERs match at 484,727 tCO2e for the monitoring period 2015-12-30 to 2018-06-19 (monitoring report, 2021).
missing Key MRV/baseline details are incomplete in the extracted record (e.g., grid EF year and baseline reassessment timing not stated in available documents).
Claim Safety
verified The project is explicitly not CORSIA-eligible, reducing aviation-claim channel risk (monitoring report, 2021).
missing Over-crediting/quality risk is elevated by contradictions on leakage justification and crediting period across documents (monitoring report, 2021; validation report, 2012).
Documentation
verified A relatively broad document set was available (PDD, monitoring report, validation report, issuance) with high extraction confidence (extracted record).
missing Corrective actions and material findings show documentation quality/control issues that required fixes (monitoring report, 2021).
Detailed Analysis
Integrity
The monitoring report (2021) indicates additionality was confirmed by the VVB using an investment test, which supports additionality. Baseline setting is project-specific under ACM0002 (version 07), and the extracted record does not state when the baseline was last reassessed, which adds uncertainty. Leakage is applied as a 0% deduction, but the monitoring reports conflict on whether leakage was justified as negligible or not addressed, weakening confidence in the leakage assessment (monitoring reports, 2012 and 2021). Material findings and corrective actions in the monitoring report (2021) flag inconsistencies in equipment description and crediting-period presentation, which is a substantive integrity concern.
Transparency
For the 2015-12-30 to 2018-06-19 monitoring period, the monitoring report (2021) shows the verified ERs equal the claimed ERs (484,727 tCO2e), which is a positive MRV signal. The grid emission factor is reported as 0.8498, but the grid EF year is not stated in available documents, limiting reproducibility. The extracted record also does not provide a baseline reassessment date, and leakage justification is inconsistently stated across monitoring reports, reducing transparency on key assumptions.
Claim Safety
The project is explicitly not CORSIA-eligible (monitoring report, 2021), which lowers the risk of problematic aviation-related claims. However, claim safety is weakened by contradictions that can affect crediting boundaries and over-crediting risk: leakage justification differs between monitoring reports (2012 vs 2021), and the crediting period differs between the monitoring report and validation report. CCP status is not stated in available documents, leaving uncertainty about alignment with higher-integrity labels.
Documentation
The extracted record indicates 12 documents were used and includes core document types (PDD, monitoring report, validation report, issuance), with high extraction confidence. Nonetheless, the monitoring report (2021) lists multiple material findings and corrective actions, including unclear site identification (GPS coordinates) and inconsistent unit/device descriptions, indicating documentation quality issues that required remediation. The presence of unresolved or historically inconsistent statements across documents (e.g., safeguards and leakage narratives) also reduces confidence in documentation consistency over time.
Overall
Overall quality is moderate: ERs are consistently claimed and verified for the stated monitoring period, and additionality is VVB-confirmed (monitoring report, 2021). Key contradictions reduce reliability: (1) leakage justification is "not addressed" in the 2021 monitoring report but "deemed negligible" in the 2012 monitoring report—given the more recent document, the 2021 statement is privileged, but the inconsistency lowers confidence; (2) safeguards, grievance mechanism, benefit sharing, and FPIC are reported as present in 2021 but absent in 2012—again the 2021 monitoring report is privileged as more recent, but the shift suggests inconsistent disclosure; (3) the crediting period is 2008–2018 in the 2021 monitoring report versus 2010–2020 in the 2012 validation report—because the monitoring report also flags an internal crediting-period contradiction requiring correction, neither value is fully reliable, so scores are reduced for integrity and claim-safety due to boundary/eligibility uncertainty.
Audit Analysis
This VCS hydropower project reports verified emission reductions matching the claimed amount for the 2015–2018 monitoring period, with additionality confirmed via an investment test. However, leakage treatment is inconsistently documented across monitoring reports, and there are notable internal inconsistencies flagged as material findings (including crediting-period inconsistencies), which weakens confidence in the underlying project record.
Project Description
This project harnessed the power of the Datong River to create clean energy for the local power grid. The plant features a concrete gravity dam, release sluice, channels, power house and switch station. It is estimated to generate 212,000MWh of electricity each year without emitting any carbon.
Red Flags
- Crediting period is inconsistent between the monitoring report (2008–2018) and the validation report (2010–2020), and the monitoring report itself notes a crediting-period contradiction requiring correction.
- Leakage is recorded as a 0% deduction but leakage justification is inconsistent across monitoring reports ("not addressed" vs "deemed negligible").
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2008 | 301,798 | 301,798 | 0 | |
| 2009 | 165,973 | 165,973 | 0 | |
| 2015 | 532 | 532 | 0 | |
| 2016 | 187,466 | 172,206 | 15,260 | |
| 2017 | 215,368 | 214,898 | 470 | |
| 2018 | 81,361 | 61,361 | 20,000 | |
| Total | 952,498 | 916,768 | 35,730 |
Cosa migliorerebbe questo punteggio
- Publish a clear, reconciled statement of the official crediting period (with registry evidence) and resolve the internal crediting-period contradiction noted in the monitoring report.
- Provide a consistent leakage assessment narrative aligned to ACM0002 requirements (explicitly stating whether leakage is negligible and why) and disclose the grid EF vintage/year and any baseline reassessment details.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed investment test
Avoidance project; no reversal risk indicated
0% deduction but justification inconsistent
Project-specific baseline; reassessment timing unclear
Safeguards/FPIC reported but inconsistent over time
Not CORSIA-eligible; CCP status not stated
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →