Datong River Tianwanggou Hydropower Station

VCS-823 ↗

6.0 / 10
Integrity
5.4
Transparency
6.2
Claim Safety
6.0
Documentation
6.8

Score Breakdown

Integrity

verified Additionality was confirmed by the VVB using an investment test (monitoring report, 2021).

missing Multiple material findings/corrective actions indicate inconsistencies in core project descriptions and crediting-period definition (monitoring report, 2021).

Transparency

verified Claimed and verified ERs match at 484,727 tCO2e for the monitoring period 2015-12-30 to 2018-06-19 (monitoring report, 2021).

missing Key MRV/baseline details are incomplete in the extracted record (e.g., grid EF year and baseline reassessment timing not stated in available documents).

Claim Safety

verified The project is explicitly not CORSIA-eligible, reducing aviation-claim channel risk (monitoring report, 2021).

missing Over-crediting/quality risk is elevated by contradictions on leakage justification and crediting period across documents (monitoring report, 2021; validation report, 2012).

Documentation

verified A relatively broad document set was available (PDD, monitoring report, validation report, issuance) with high extraction confidence (extracted record).

missing Corrective actions and material findings show documentation quality/control issues that required fixes (monitoring report, 2021).

Detailed Analysis

Integrity

The monitoring report (2021) indicates additionality was confirmed by the VVB using an investment test, which supports additionality. Baseline setting is project-specific under ACM0002 (version 07), and the extracted record does not state when the baseline was last reassessed, which adds uncertainty. Leakage is applied as a 0% deduction, but the monitoring reports conflict on whether leakage was justified as negligible or not addressed, weakening confidence in the leakage assessment (monitoring reports, 2012 and 2021). Material findings and corrective actions in the monitoring report (2021) flag inconsistencies in equipment description and crediting-period presentation, which is a substantive integrity concern.

Transparency

For the 2015-12-30 to 2018-06-19 monitoring period, the monitoring report (2021) shows the verified ERs equal the claimed ERs (484,727 tCO2e), which is a positive MRV signal. The grid emission factor is reported as 0.8498, but the grid EF year is not stated in available documents, limiting reproducibility. The extracted record also does not provide a baseline reassessment date, and leakage justification is inconsistently stated across monitoring reports, reducing transparency on key assumptions.

Claim Safety

The project is explicitly not CORSIA-eligible (monitoring report, 2021), which lowers the risk of problematic aviation-related claims. However, claim safety is weakened by contradictions that can affect crediting boundaries and over-crediting risk: leakage justification differs between monitoring reports (2012 vs 2021), and the crediting period differs between the monitoring report and validation report. CCP status is not stated in available documents, leaving uncertainty about alignment with higher-integrity labels.

Documentation

The extracted record indicates 12 documents were used and includes core document types (PDD, monitoring report, validation report, issuance), with high extraction confidence. Nonetheless, the monitoring report (2021) lists multiple material findings and corrective actions, including unclear site identification (GPS coordinates) and inconsistent unit/device descriptions, indicating documentation quality issues that required remediation. The presence of unresolved or historically inconsistent statements across documents (e.g., safeguards and leakage narratives) also reduces confidence in documentation consistency over time.

Overall

Overall quality is moderate: ERs are consistently claimed and verified for the stated monitoring period, and additionality is VVB-confirmed (monitoring report, 2021). Key contradictions reduce reliability: (1) leakage justification is "not addressed" in the 2021 monitoring report but "deemed negligible" in the 2012 monitoring report—given the more recent document, the 2021 statement is privileged, but the inconsistency lowers confidence; (2) safeguards, grievance mechanism, benefit sharing, and FPIC are reported as present in 2021 but absent in 2012—again the 2021 monitoring report is privileged as more recent, but the shift suggests inconsistent disclosure; (3) the crediting period is 2008–2018 in the 2021 monitoring report versus 2010–2020 in the 2012 validation report—because the monitoring report also flags an internal crediting-period contradiction requiring correction, neither value is fully reliable, so scores are reduced for integrity and claim-safety due to boundary/eligibility uncertainty.

Audit Analysis

This VCS hydropower project reports verified emission reductions matching the claimed amount for the 2015–2018 monitoring period, with additionality confirmed via an investment test. However, leakage treatment is inconsistently documented across monitoring reports, and there are notable internal inconsistencies flagged as material findings (including crediting-period inconsistencies), which weakens confidence in the underlying project record.

Project Description

This project harnessed the power of the Datong River to create clean energy for the local power grid. The plant features a concrete gravity dam, release sluice, channels, power house and switch station. It is estimated to generate 212,000MWh of electricity each year without emitting any carbon.

Red Flags

  • Crediting period is inconsistent between the monitoring report (2008–2018) and the validation report (2010–2020), and the monitoring report itself notes a crediting-period contradiction requiring correction.
  • Leakage is recorded as a 0% deduction but leakage justification is inconsistent across monitoring reports ("not addressed" vs "deemed negligible").

Credit Vintages

Issued Retired Available
2008
301,798 301,798 0
2009
165,973 165,973 0
2015
532 532 0
2016
187,466 172,206 15,260
2017
215,368 214,898 470
2018
81,361 61,361 20,000
Total 952,498 916,768 35,730

Cosa migliorerebbe questo punteggio

  • Publish a clear, reconciled statement of the official crediting period (with registry evidence) and resolve the internal crediting-period contradiction noted in the monitoring report.
  • Provide a consistent leakage assessment narrative aligned to ACM0002 requirements (explicitly stating whether leakage is negligible and why) and disclose the grid EF vintage/year and any baseline reassessment details.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Avoidance project; no reversal risk indicated

Leakage

0% deduction but justification inconsistent

Baseline

Project-specific baseline; reassessment timing unclear

Safeguards

Safeguards/FPIC reported but inconsistent over time

Double-claim

Not CORSIA-eligible; CCP status not stated

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-02 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti