FVR_VCS VelR 1221_23TQMD28_3.0Aa_12032025
Published by Verra for this project. CarbonMeld stores a copy as retrieved from the registry: the document is the registry's, not ours.
- Project
- Eglence I-II Hydroelectric Power Plant (VCS-1221)
- Document type
- Validation Report
- Registry
- Verra
- Retrieved from the registry
- File
- FVR_VCS VelR 1221_23TQMD28_3.0Aa_12032025.pdf
Open the PDFRegistry record of the project ↗
AnalysisDocument-based rating 3.6/10Re-assessment pending
See CarbonMeld's analysis of this project →Cite this document
Verra. FVR_VCS VelR 1221_23TQMD28_3.0Aa_12032025 (Validation Report), Eglence I-II Hydroelectric Power Plant (VCS-1221). CarbonMeld copy, retrieved from the registry on 3 Sep 2026: https://carbonmeld.com/projects/docs/eglence-i-ii-hydroelectric-power-plant-d1c3b5/3d744d6b9a7395c1/.