Registry document
VCS-Verification-Report - 1204 2019-8-1 to 2022-7-31
Published by Verra for this project. CarbonMeld stores a copy as retrieved from the registry: the document is the registry's, not ours.
- Project
- Guohua Wulate Zhongqi Phase I 49.5 MW Wind Farm Project (VCS-1204)
- Document type
- Verification Report
- Registry
- Verra
- Retrieved from the registry
- File
- VCS-Verification-Report - 1204 2019-8-1 to 2022-7-31.pdf
Open the PDFRegistry record of the project ↗
AnalysisDocument-based rating 3.5/10Re-assessment pending
See CarbonMeld's analysis of this project →Cite this document
Verra. VCS-Verification-Report - 1204 2019-8-1 to 2022-7-31 (Verification Report), Guohua Wulate Zhongqi Phase I 49.5 MW Wind Farm Project (VCS-1204). CarbonMeld copy, retrieved from the registry on 3 Sep 2026: https://carbonmeld.com/projects/docs/guohua-wulate-zhongqi-phase-i-49-5-mw-wind-farm-project-d461f4/4cd984c6a911b420/.
Please cite or link this page rather than the PDF file: it shows where the document comes from and links to the project's page.