Re-assessment pending
Guohua Wulate Zhongqi Phase I 49.5 MW Wind Farm Project
- Standard
- VCS
- Methodology
- ACM0002 (CDM)
- Registry
- VCS-1204 ↗ · Registered
- Country
- China
- Credit type
- avoidance
CarbonMeld's document-based rating gives Guohua Wulate Zhongqi Phase I 49.5 MW Wind Farm Project (VCS-1204) 3.5 out of 10 (Low rating) under CarbonMeld methodology v3, documents read on 16 Oct 2026; a re-assessment is pending. The analysis read 19 of the 23 registry documents. It is CarbonMeld's own assessment, not a rating given by the registry or the standard.
Assessment
Evidence
Eligibility & market
What can you claim with this credit?
Four checks buyers ask about, from the registry and the Integrity Council (ICVCM).
Airlines (CORSIA)
No CORSIA label on the registry
Not usable for airlines' CORSIA obligations.
Source: registry label · read on 15 Nov 2026
Covers: this project's credit records as read on the registry
Integrity label (ICVCM CCP)
Methodology not approved by ICVCMACM0002
The Integrity Council assessed this methodology as not meeting the Core Carbon Principles.
Source: ICVCM assessment · ICVCM table read on 4 Nov 2026
Covers: the methodology (every project using it), not this project's credits
Removal or reduction
Emission reduction or avoidance
Prevents or reduces emissions — fits contribution claims, not SBTi neutralisation.
Source: project sector
Covers: the project type, not a label on individual credits
Paris Agreement (Article 6)
No Article 6 authorization
No corresponding adjustment: the host country can also count this reduction towards its own target.
Source: registry label · read on 15 Nov 2026
Covers: this project's credit records as read on the registry
Information only, from public sources. Claim rules (CORSIA, SBTi, EU rules on green claims) change: check them before making a public claim. Since 27 September 2026, EU consumer rules do not allow “climate neutral” product claims based on offsets.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2009 | 59,125 | 59,125 | 0 | |
| 2010 | 19,277 | 19,277 | 0 | |
| 2014 | 144,362 | 136,875 | 7,487 | |
| 2015 | 146,240 | 146,070 | 170 | |
| 2016 | 142,597 | 119,309 | 23,288 | |
| 2017 | 145,987 | 145,987 | 0 | |
| 2018 | 147,633 | 147,633 | 0 | |
| 2019 | 84,918 | 59,471 | 25,447 | |
| Total | 890,139 | 833,747 | 56,392 |
Methodology versions used
The methodology version stated in each monitoring, verification and issuance document, by period, compared with the official methodology pages.
2009–2010ACM0002 v9.0since replaced by v22.0
monitoring report + verification report
official page · verified on
2014–2019ACM0002 v9.0since replaced by v22.0
monitoring report + verification report
official page · verified on
2019–2022ACM0002 v20.0since replaced by v22.0
monitoring report + verification report
official page · verified on
- ACM0002: Active (CDM / UNFCCC) · official page · verified on
A version is shown only when the document's own text writes it next to the methodology code. Current versions, status and CCP ranges come from the official pages linked, checked on the date shown.
Retired by
- The Boeing Company168,719 t
- Delta Air Lines34,000 t
- iSwitch Pte Ltd25,000 t
- Geneco Customers on Geneco's Green Plans8,600 t
- Raiz Invest Australia Ltd2,693 t
- City Smart1,800 t
- Corona Energy1,795 t
- Foxes Property 1 S.A.R.L 1, Allee Scheffer L-2520 Luxembourg, Grand Duchy of LUXEMBOURG - Ark Royal, Campbeltown Road, Tranmere, Birkenhead CH41 9BP1,794 t
- Certas Energy1,287 t
- Pangolin757 t
Organisations named as beneficiaries in the registry's public retirement records. (+14)
Where to buy
Got an offer for these credits? Check it against the registry →
Marketplaces
Each listing shows what the shop published on the day it was checked. The registry balance on this page is not a seller's stock, and some shops show no price.
+ Know where to buy this?
Listing multiple projects? Send us a CSV at listings@carbonmeld.com.
Profile & governance
Are you the project owner?
Full analysis (free for owners)
Owners get free access to the full analysis of their own project: every rule that raised or lowered the number, with the fact and the source it rests on, the negative facts' detail and the documents read. Write to us from your organisation's email address.
hello@carbonmeld.com →Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the rating.
hello@carbonmeld.com →Contest this rating
Something wrong in the analysis, or a registry document we have not used? Send us the link to the public source: you get a reference and an answer within 30 days.
Contest this rating →Cite this page
CarbonMeld (2026). Guohua Wulate Zhongqi Phase I 49.5 MW Wind Farm Project (VCS-1204): CarbonMeld document-based rating, methodology v3, documents read on 16 Oct 2026. https://carbonmeld.com/projects/guohua-wulate-zhongqi-phase-i-49-5-mw-wind-farm-project-vcs-1204/.
The citation names the rating by its methodology version and the day the documents were read.
Records with the same name in other registries
Records in another registry with the same name, country and methodology. Each has its own credits, documents and rating.
- Guohua Wulate Zhongqi Phase I 49.5 MW Wind farm ProjectClean Development Mechanism · CDM-2597
Similar projects
Same methodology or sector, the same registry first.
- Hong Phong 4 Solar 48 MW ProjectVCS-1975
- Quang Minh Solar Power ProjectVCS-1964
- Solar and Wind Power Project by NTPC LimitedVCS-1772
- The Cevizlik Run-Of-River Hydroelectric Power PlantVCS-753
- Wind Energy Project in Harapanahalli, KarnatakaVCS-1482
- Midilli Hydroelectric Power PlantVCS-1330
- Grid Connected Wind Power Project in Tamil NaduVCS-909
- 40MW Bundled Solar Project in Telangana, IndiaVCS-1990
