Midilli Hydroelectric Power Plant
Score Breakdown
Integrity
verified Additionality was confirmed by the VVB using an investment test in the verification report.
missing Leakage is described as not addressed, and no buffer pool percentage is stated; the project is a hydro project, so permanence is generally strong but documentation is incomplete.
Transparency
verified The verification report names the VVB, gives the monitoring period, and reports verified emissions for the period.
missing The extracted record has low extraction confidence and includes contradictory emissions and crediting-period values, which weakens confidence in the public record.
Claim Safety
verified The project is marked as not CORSIA-eligible, which reduces dual-claim risk.
missing The latest verification record shows leakage not addressed and a project-specific baseline, while the emissions figures in the extracted record conflict sharply.
Documentation
verified Sixteen documents were used and the verification report includes corrective actions that were closed.
missing Minimum extraction confidence is low, and several key items such as buffer pool coverage, baseline reassessment timing, and usage monitoring details are not found in the extracted record.
Detailed Analysis
Integrity
The verification report confirms additionality through an investment test and says no reversal events were reported, which supports the project’s core environmental integrity. At the same time, leakage is marked as not addressed, and no buffer pool percentage is stated, so permanence and leakage treatment are only partially evidenced. The baseline is project-specific rather than standardized, and no baseline reassessment date is found, which limits robustness.
Transparency
The verification report identifies LGAI Technological Center, S.A. (Applus+ Certification) as the VVB and provides a monitoring period from 2020-07-01 to 2022-12-26. However, the extracted record has low extraction confidence, and the reported emissions figures conflict materially between 48,647 verified ERs and 183,208 claimed ERs. That inconsistency, plus the editorial error noted in the crediting period, reduces transparency.
Claim Safety
Claim safety is weakened by the unresolved leakage treatment and the use of a project baseline, both of which increase over-crediting risk relative to more conservative approaches. The project is marked as not CORSIA-eligible, which helps reduce dual-market claim risk, but CCP status is not stated. The large discrepancy between claimed and verified ER figures is a major caution signal for claim reliability.
Documentation
Documentation is mixed: the verification report lists material findings and corrective actions, and it says the CARs and CLs were successfully closed. But the record is incomplete on several important items, including buffer pool coverage, usage monitoring, and baseline reassessment timing. The low extraction confidence also means at least one key source was poorly readable, which lowers confidence in the documentation quality.
Overall
I privileged the 2023-11-16 verification report over older extracted values because it is the most recent and specific source, especially for leakage, safeguards, and verified emissions. Where contradictions exist, I treated them as reliability risks rather than averaging them: the emissions and crediting-period conflicts are material, and the later report’s values were used because they are more recent and tied to verification. Under the gate rules, the low documentation score would cap transparency post-scoring, and the integrity score remains above the 4.0 threshold, so no overall cap is triggered.
Audit Analysis
The project has some strengths: additionality was confirmed by the VVB, no reversal events were reported, and the verification report shows safeguards such as FPIC and a grievance mechanism. However, the record also shows important reliability issues, including contradictory emissions and crediting-period figures, a project baseline rather than a more robust standardized baseline, and leakage that was not addressed in the latest verification record.
Project Description
Proponent: Masat Enerji Elektrik Uretim ve Tic. Ltd. Sti. Protocol categories: Energy industries (renewable/non-renewable sources) Protocols: ACM0002 Estimated annual GHG reductions: 63761 tCO2e Region: Middle East Registration date: 2012-07-31
Red Flags
- The verification report lists 48,647 verified ERs, while an earlier figure in the extracted record shows 183,208 claimed ERs, creating a major consistency concern.
- Leakage is marked as not addressed in the latest verification record, and the project uses a project-specific baseline with no reassessment date found.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2013 | 41,771 | 3,697 | 38,074 | |
| 2014 | 9,119 | 3,205 | 5,914 | |
| 2015 | 37,566 | 37,563 | 3 | |
| 2016 | 38,657 | 31,042 | 7,615 | |
| 2017 | 22,908 | 0 | 22,908 | |
| 2018 | 19,249 | 942 | 18,307 | |
| 2019 | 88 | 0 | 88 | |
| 2020 | 34,056 | 0 | 34,056 | |
| 2021 | 9,835 | 0 | 9,835 | |
| 2022 | 25,605 | 0 | 25,605 | |
| Total | 238,854 | 76,449 | 162,405 |
Cosa migliorerebbe questo punteggio
- Provide a clear, reconciled emissions and crediting-period table that explains the discrepancy between claimed and verified ER figures and corrects the editorial error.
- Document a quantified leakage assessment, baseline reassessment history, and buffer pool treatment in the verification and monitoring materials.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed investment test
No reversal events reported
Leakage not addressed
Project baseline, reassessment not found
FPIC and grievance mechanism documented
Not CORSIA-eligible; CCP status not stated
Where to buy
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →