Solar and Wind Power Project by NTPC Limited
Score Breakdown
Integrity
verified Additionality was confirmed by the VVB using an investment test, which supports the project case.
missing The verification report records multiple material findings and corrective actions, including double counting concerns and inconsistent monitoring data.
Transparency
verified The monitoring period, verifier name, and both claimed and verified emission reductions are stated in the verification report.
missing Low extraction confidence and missing or inconsistent supporting documents reduce confidence in the completeness of the public record.
Claim Safety
verified The project uses ACM0002 with a stated leakage deduction of 0% and a deemed-negligible leakage justification.
missing Verified emission reductions are much lower than claimed, and the report flags inconsistencies in emission reduction values and double counting risk.
Documentation
verified There are many extracted facts and a named VVB, which helps traceability.
missing Extraction confidence is low, and the verification report itself required several closed corrective actions, including missing documents and monitoring inconsistencies.
Detailed Analysis
Integrity
The project has a positive integrity signal because the verification report says additionality was confirmed through an investment test by LGAI Technological Center (Applus+ Certification). However, the same report lists multiple material findings and corrective actions, including double counting concerns, inconsistent monitoring data, and missing supporting documents, which materially weaken confidence. The project also has no reversal events reported, but permanence is less relevant for this avoidance-type renewable project and the buffer pool is not stated.
Transparency
Transparency is mixed: the verification report provides the monitoring period, verifier identity, and both claimed and verified emission reductions. At the same time, the record shows low extraction confidence and several documentation gaps, including missing supporting documents and inconsistent monitoring-period details that had to be corrected. The registry status is clear, but the overall audit trail is not fully clean.
Claim Safety
Claim safety is weakened by the large gap between claimed emission reductions of 2,089,638 and verified emission reductions of 1,225,812. The report also flags inconsistent emission reduction values, double counting concerns, and a need for a no-double-accounting declaration, which increases over-crediting and greenwashing risk. On the positive side, the methodology is stated and leakage is treated as negligible with a 0% deduction, but that does not offset the verification issues.
Documentation
Documentation quality is below average because the extraction confidence is low and the verification report required numerous corrective actions. The record does include a named VVB, a monitoring period, and a long list of findings and closures, but several key items were missing or inconsistent before correction, such as supporting documents, calibration certificates, and stakeholder consultation records. The crediting period is also older than the monitoring period, which is normal, but the overall file still appears incomplete and difficult to reconcile.
Overall
Overall, this is a functioning registered VCS renewable project with some strong elements, especially VVB-confirmed additionality and a clear methodology. However, the verification report contains several contradictions and reliability issues: the contradiction on leakage justification is resolved in favor of the later verification report that says leakage is negligible, the additionality-test contradiction is resolved in favor of the later report’s investment test, the benefit-sharing contradiction is resolved in favor of the later report that describes it, and the emission-reduction contradiction is resolved in favor of the more recent verified figure of 1,225,812. Because the verified amount is far below the claimed amount and the report includes multiple material findings, the project should be viewed as moderate-to-low confidence rather than high quality.
Audit Analysis
This is a registered renewable energy project with VVB-confirmed additionality and a quantified leakage deduction of 0%, but the verification record shows multiple corrective actions and material findings that weaken confidence. The biggest concern is reliability: the verified emission reductions are far below the claimed amount, and the report contains contradictions and low extraction confidence, so the claim should be treated cautiously.
Project Description
Proponent: NTPC GREEN ENERGY LIMITED Protocol categories: Energy industries (renewable/non-renewable sources) Protocols: ACM0002 Estimated annual GHG reductions: 940891 tCO2e Region: Asia Registration date: 2018-06-29
Red Flags
- Verified emission reductions were 1,225,812 versus 2,089,638 claimed, a large gap that raises over-crediting concerns.
- The verification report lists multiple material findings, including double counting concerns, inconsistent monitoring data, missing supporting documents, and stakeholder consultation gaps.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2016 | 29,053 | 0 | 29,053 | |
| 2017 | 70,947 | 0 | 70,947 | |
| Total | 100,000 | 0 | 100,000 |
Cosa migliorerebbe questo punteggio
- Provide a fully reconciled emissions calculation pack showing why verified reductions are far below claimed reductions, with all supporting documents and database versions aligned.
- Publish a complete, consistent monitoring and stakeholder-consultation record, including calibration certificates, no-double-accounting declarations, and a clear explanation of the double-counting review.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed investment test
No reversal events, buffer pool not stated
0% deduction with negligible justification
Project baseline, reassessment timing not stated
FPIC and grievance mechanism present, but consultation recor
CORSIA-eligible; CCP status not stated
Where to buy
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →