Guohua Wulate Zhongqi Phase I 49.5 MW Wind farm Project
#796of 1935 in Renewable energy#416of 1084 in China#498of 1339 in Verra (VCS)#625of 1287 in ACM0002
Audit Analysis
A 49.5 MW wind farm in China generating VCS avoidance credits under ACM0002, validated by Applus+ Certification. The project uses a jurisdictional baseline and a 0% leakage deduction (deemed negligible, reasonable for wind), with no material findings or corrective actions. However, three contradictions between the validation and monitoring reports—grid emission factor, claimed ERR, and crediting period—introduce meaningful uncertainty, and several key integrity parameters (additionality test type, buffer pool, FNRB) are absent from the extracted record.
Red Flags
- Grid emission factor differs between the validation report (0.84045, 2020) and the monitoring report (1.0755, 2019), a 28% discrepancy that directly affects credit volume
- Claimed ERR of 1,044,670 tCO₂e in the validation report versus 811,737 tCO₂e in the monitoring report (a 29% gap) is unexplained in the available documents
- Crediting period stated as 2009–2031 in the monitoring report but 2019–2029 in the more recent validation report, suggesting a re-validation that is not clearly documented in the extracted record
- Additionality test type and VVB confirmation of additionality are not stated in any available document, despite being a core VCS requirement for wind projects
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
VVB validated but test type not stated
Avoidance project, no reversal risk
0% deemed negligible, reasonable for wind
Jurisdictional, reassessed 2020
Mentioned but FPIC and grievance not detailed
CORSIA and CCP status not stated
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →