Skip to main content
CarbonMeld CarbonMeld Carbon Observatory

Registry document

20160410-892-VCS Monitoring Report

Published by Verra for this project. CarbonMeld stores a copy as retrieved from the registry: the document is the registry's, not ours.

Project
Hebei Chengde Weichang Yudaokou Pasture 150MW Wind Farm Project (VCS-892)
Document type
Monitoring Report
Registry
Verra
Retrieved from the registry
File
20160410-892-VCS Monitoring Report .pdf

Open the PDFRegistry record of the project ↗

AnalysisDocument-based rating 3.5/10Re-assessment pending

See CarbonMeld's analysis of this project →

Cite this document

Verra. 20160410-892-VCS Monitoring Report (Monitoring Report), Hebei Chengde Weichang Yudaokou Pasture 150MW Wind Farm Project (VCS-892). CarbonMeld copy, retrieved from the registry on 3 Sep 2026: https://carbonmeld.com/projects/docs/hebei-chengde-weichang-yudaokou-pasture-150mw-wind-farm-proj-6f804c/418f114f29e19dd7/.

Please cite or link this page rather than the PDF file: it shows where the document comes from and links to the project's page.