Hebei Chengde Weichang Yudaokou Pasture 150MW Wind Farm Project

VCS-892 ↗

6.4 / 10
Integrity
6.2
Transparency
6.6
Claim Safety
6.0
Documentation
7.4

Score Breakdown

Integrity

verified The monitoring record (2023-08-31) shows the claimed and verified emission reductions are identical at 273,055 tCO2e for 2021-12-01 to 2022-05-31, and no material findings were reported.

missing Baseline and key quantification inputs show inconsistencies across documents (notably the grid emission factor and leakage treatment), weakening confidence in baseline validity and ER quantification.

Transparency

verified The project identifies the VVB (CTI) and provides a clearly defined monitoring period (2021-12-01 — 2022-05-31) with matching claimed vs verified totals in the 2023 monitoring record.

missing Corrective actions in the monitoring record (2023-08-31) indicate reporting gaps and monitoring-plan compliance clarifications were required (including the 10kV backup line).

Claim Safety

verified The project is explicitly not CORSIA-eligible in the extracted record, reducing aviation-claim channel risk.

missing Over-crediting/greenwashing risk is elevated by contradictory grid emission factors and conflicting verified ER totals across validation reports.

Documentation

verified A relatively complete document set is referenced (PDD, monitoring report, validation report, issuance) with high extraction confidence and 41 documents used.

missing Multiple contradictions across official documents (safeguards, crediting period, ER totals, grid EF) indicate record-management and consistency issues.

Detailed Analysis

Integrity

Additionality appears reasonably supported because the validation/verification process confirms an investment test, and the monitoring record (2023-08-31) reports no material findings. The baseline is project-specific under ACM0002, but the extracted record does not state when the baseline was last reassessed, which is an evidence gap for baseline robustness. Integrity is further weakened by inconsistent quantification inputs across validation reports (notably the grid emission factor) and inconsistent leakage treatment between the validation report (2016-05-20) and the monitoring record (2023-08-31).

Transparency

The monitoring record (2023-08-31) provides a clear monitoring period (2021-12-01 — 2022-05-31) and shows the same total for claimed and verified emission reductions (273,055 tCO2e), which supports MRV clarity for that period. However, the same monitoring record lists corrective actions, including adding a comparison table of estimated vs achieved reductions and clarifying compliance with the registered monitoring plan regarding a 10kV backup line. These issues reduce transparency because they indicate the reporting package was incomplete or required clarification during review.

Claim Safety

The project is marked as not CORSIA-eligible in the extracted record, which lowers the risk of high-profile aviation claims. Nonetheless, claim safety is constrained by over-crediting risk signals: validation reports disagree on the grid emission factor (0.8269 vs 1.05485) and on the verified ER total (273,055 vs 136,337), both of which can materially affect credited outcomes. Leakage is also problematic: the monitoring record (2023-08-31) shows a 0% leakage deduction while stating leakage was not addressed, conflicting with the validation report (2016-05-20) that indicates leakage was quantified.

Documentation

Documentation coverage is relatively strong: the extracted record references a PDD, monitoring report, validation report, and issuance, with 41 documents used and high extraction confidence. However, the presence of multiple contradictions across documents (safeguards and stakeholder process disclosures, crediting period dates, grid emission factor values, and verified ER totals) indicates inconsistent documentation over time. Corrective actions in the monitoring record (2023-08-31) also suggest the submitted documentation required supplementation and clarification.

Overall

Overall scoring is pulled down primarily by internal inconsistencies across official documents, which reduce confidence in quantification and stakeholder-process claims. For the leakage justification contradiction, the 2023 monitoring record is privileged over the 2016 validation report because it is more recent and should reflect the monitoring-period treatment; this inconsistency lowers integrity and claim safety. For safeguards/FPIC/grievance/benefit-sharing contradictions, the 2023 monitoring record is privileged as the latest disclosure, but the earlier 2016 monitoring report conflicts, so safeguards confidence is discounted. For the verified ER total and grid emission factor contradictions, the more recent validation report values (2024-07-18) are privileged over older validation reports, but the magnitude of the discrepancies indicates reliability risk and drives a conservative overall score. For the crediting period contradiction, the 2023 monitoring record is privileged as the latest, but the mismatch with the 2021 monitoring report suggests registry/record inconsistency and reduces documentation confidence. (Gate rules note: integrity is above 4.0 and documentation is above 3.0, so no deterministic caps would apply.)

Audit Analysis

This VCS wind project shows moderate integrity: additionality is confirmed by the VVB and the claimed and verified emission reductions match for the latest monitoring period. However, multiple cross-document inconsistencies (grid emission factor, credited ER totals, crediting period, and safeguards disclosures) reduce confidence and increase perceived over-crediting and reputational risk.

Project Description

The Hebei Chengde Weichang Yudaokou Pasture 150MW Wind Farm Project is a new renewable power generation project located in Hebei, China. The project features the installation and operation of 100 wind turbines with a total installed capacity of 150MW. The power generated by the project is transmitted to the North China Power Grid.

Red Flags

  • Conflicting verified emission reduction totals across validation reports (273,055 vs 136,337), creating uncertainty about what was actually verified/issued.
  • Grid emission factor differs materially between validation reports (0.8269 vs 1.05485), which can significantly change credited reductions.
  • Leakage treatment is inconsistent: earlier validation indicates leakage was quantified, while the 2023 monitoring record shows leakage not addressed despite a 0% deduction.
  • Safeguards, FPIC, grievance mechanism, and benefit-sharing are reported as present in 2023 but absent in a 2016 monitoring report, suggesting evolving or inconsistently documented stakeholder processes.

Credit Vintages

Issued Retired Available
2010
48,374 48,374 0
2011
87,053 87,053 0
2012
380,769 380,769 0
2015
83,098 83,098 0
2016
332,434 332,434 0
2017
373,876 373,876 0
2018
339,116 339,116 0
2019
379,412 242,335 137,077
2020
58,870 48,860 10,010
Total 2,083,002 1,935,915 147,087

Cosa migliorerebbe questo punteggio

  • Publish a reconciled quantification note that explains changes across validation reports (grid emission factor choice, data sources/years, and why verified ER totals differ), and align all documents to a single authoritative set of parameters.
  • Provide a consistent, auditable safeguards package (FPIC evidence, grievance procedure records, and benefit-sharing documentation) and explain why earlier monitoring documentation reported these as absent.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

Investment test confirmed by VVB

Permanence

Avoidance project; no reversal events reported

Leakage

0% deduction but justification inconsistent/missing

Baseline

Project-specific baseline; reassessment timing unclear

Safeguards

Safeguards reported but inconsistent across years

Double-claim

Not CORSIA-eligible; CCP status not stated

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-02 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti