Registry document
VCS-Verification-Report-Hebei Guyuan County Dongxinying 199.5 MW Wind Power Project VCS903_CTI-clean
Published by Verra for this project. CarbonMeld stores a copy as retrieved from the registry: the document is the registry's, not ours.
- Project
- Hebei Guyuan County Dongxinying 199.5 MW Wind Power Project (VCS-903)
- Document type
- Verification Report
- Registry
- Verra
- Retrieved from the registry
- File
- VCS-Verification-Report-Hebei Guyuan County Dongxinying 199.5 MW Wind Power Project VCS903_CTI-clean.pdf
Open the PDFRegistry record of the project ↗
AnalysisDocument-based rating 3.5/10Re-assessment pending
See CarbonMeld's analysis of this project →Cite this document
Verra. VCS-Verification-Report-Hebei Guyuan County Dongxinying 199.5 MW Wind Power Project VCS903_CTI-clean (Verification Report), Hebei Guyuan County Dongxinying 199.5 MW Wind Power Project (VCS-903). CarbonMeld copy, retrieved from the registry on 3 Sep 2026: https://carbonmeld.com/projects/docs/hebei-guyuan-county-dongxinying-199-5-mw-wind-power-project-48ee73/de66ea30e240882b/.
Please cite or link this page rather than the PDF file: it shows where the document comes from and links to the project's page.
