Vai al contenuto principale
VCS avoidance China Vintage 2020 Registry: Registered Documentazione completa General Methodology v2.0

Hebei Guyuan County Dongxinying 199.5 MW Wind Power Project

VCS-903 ↗

6.1 / 10
Integrity
6.1
Transparency
6.0
Claim Safety
5.4
Documentation
7.2

Score Breakdown

Integrity

verified Additionality is confirmed by the VVB via an investment test (validation/verification documentation in the extracted record).

missing Baseline and key quantification inputs show inconsistencies across documents (e.g., grid emission factor differs materially between validation reports), increasing over-crediting risk.

Transparency

verified VVB is identified (LGAI Technological Center, S.A. / Applus+), and a clear monitoring period is provided (2022-06-01 to 2023-05-31).

missing Reported ER figures and other core parameters conflict across documents, reducing MRV transparency and traceability.

Claim Safety

verified The project is explicitly not CORSIA-eligible, reducing certain downstream double-claiming/eligibility risks.

missing Conflicting ER totals and inconsistent leakage/baseline inputs elevate the risk of over-crediting and unsafe claims.

Documentation

verified A substantial document set was used (52 documents including PDD, monitoring reports, validation reports, and issuance) with high extraction confidence.

missing Corrective action(s) were required to improve ER reporting consistency (e.g., supplementing the table comparing estimated vs achieved ERs).

Detailed Analysis

Integrity

Additionality appears reasonably robust because the validation/verification documentation confirms additionality using an investment test and it is confirmed by the VVB. Baseline setting is project-specific (per the extracted record) and the timing of baseline reassessment is not stated in available documents, which weakens robustness over time. Integrity is further reduced by inconsistencies in core quantification inputs (notably the grid emission factor differs between validation reports) and by inconsistent leakage treatment between the 2023 monitoring report and an earlier validation report.

Transparency

The extracted record provides key MRV identifiers, including the VVB name (Applus+ Certification) and a defined monitoring period (2022-06-01 to 2023-05-31) in the 2023 monitoring report. However, transparency is undermined by major discrepancies in reported emission reductions across documents (including different verified totals in different validation/verification records). The 2023 monitoring report also triggered a corrective action to supplement the comparison of estimated versus achieved emission reductions, indicating reporting gaps that affect clarity.

Claim Safety

Claim safety is mixed: the project is explicitly not CORSIA-eligible, which reduces certain reputational and double-claiming concerns tied to CORSIA use. At the same time, the extracted record shows conflicting ER quantities and conflicting grid emission factors across validation reports, which increases the likelihood of over-crediting or at least confusion in public claims. Leakage is particularly concerning because the latest monitoring report does not address leakage while an earlier validation report indicates leakage was quantified, making it harder to defend claims consistently.

Documentation

Documentation coverage is relatively strong: the evidence set includes a PDD, monitoring report(s), validation report(s), and issuance records, with 52 documents used and high extraction confidence. The presence of a corrective action in the 2023 monitoring report (to supplement the ER comparison table) suggests some documentation quality issues but not necessarily fundamental non-compliance. Overall completeness is good, but internal consistency across documents is a notable weakness.

Overall

Overall quality is moderate because additionality is VVB-confirmed and the project is a standard renewable energy activity under ACM0002, but reliability is reduced by repeated contradictions across official documents. For the conflicting claimed ERs (311,932 in the 2012-11-26 validation report vs 114,391 in the 2012-09-20 validation report), the later-dated validation report value is privileged as the more recent revision, but the contradiction still lowers confidence. For verified ERs (353,662 in a 2023-09-01 validation/verification record vs 49,572 in a 2022-11-24 record), the 2023 value is privileged as more recent, yet the magnitude of the discrepancy is a serious red flag. For leakage justification (2023 monitoring report says not addressed vs 2016 validation report says quantified), the monitoring report is privileged for the monitored period but scored down because it omits a key element previously treated. For safeguards/FPIC/grievance/benefit-sharing contradictions (2016 monitoring report indicates absent vs 2023 monitoring report indicates present), the more recent 2023 monitoring report is privileged, but the shift suggests inconsistent disclosure over time. For the grid emission factor (0.8269 in 2023-09-01 validation/verification vs 1.05485 in 2020-03-22 validation), the more recent 2023 figure is privileged, but the inconsistency increases over-crediting concern. For the crediting period (2020-05-25 to 2030-05-24 in 2023 monitoring report vs 2018-07-17 to 2028-07-16 in 2022 monitoring report), the later 2023 monitoring report is privileged, but the discrepancy indicates registry/document control issues and reduces scores.

Audit Analysis

This is a VCS wind power avoidance project using ACM0002 with additionality confirmed by the VVB and no material findings reported in the latest extracted record. However, multiple cross-document inconsistencies (including verified ERs, grid emission factor, and crediting period) and weak/unclear leakage treatment in the most recent monitoring record increase over-crediting and reliability risk.

Project Description

Hebei Guyuan County Dongxinying 199.5 MW Wind Power Project (hereinafter referred to as the project) is developed by Hebei Construction Investment New Energy Co., Ltd. It is located at the south of Guyuan County, Hebei Province, P.R.China. The project involves the installation of 133 sets of wind turbine, each of which has a rated installed capacity of 1,500 kW, providing a total installed capacity of 199.5 MW. The annual output of the project is estimated to be 405,685 MWh and the electricity will be exported to the North China Power Grid (NCPG). The scenario existing prior to the start of the implementation of the project is: the same electricity output by the project activity would have otherwise been generated by the operation of NCPG connected power plants and by the addition of new generation sources. That is the same as the baseline scenario.

Red Flags

  • Large inconsistencies across documents for verified emission reductions (e.g., 353,662 vs 49,572) and claimed ERs (311,932 vs 114,391), undermining confidence in reported outcomes
  • Leakage treatment is inconsistent: the 2023 monitoring report does not address leakage while an earlier validation report states leakage was quantified

Credit Vintages

Issued Retired Available
2010
187,044 187,044 0
2011
445,301 436,100 9,201
2012
444,256 444,256 0
2018
473,639 473,525 114
2019
760,265 743,023 17,242
2020
219,241 97,750 121,491
Total 2,529,746 2,381,698 148,048

Cosa migliorerebbe questo punteggio

  • Publish a reconciled ER accounting note that explains differences between historical and current claimed/verified ER totals (including which periods and parameters changed) and aligns all public documents.
  • Provide explicit leakage assessment in the latest monitoring report (even if zero), including justification consistent with ACM0002 and prior validation statements, and document any baseline parameter updates (e.g., grid EF source/year and recalculation rationale).

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Avoidance project; no reversal events reported

Leakage

0% deduction but latest report does not address leakage

Baseline

Project-specific baseline; reassessment timing unclear

Safeguards

Safeguards/FPIC and grievance reported, but inconsistent over time

Double-claim

Not CORSIA-eligible; CCP status not stated

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-02 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti