Skip to main content
Database · Buyer

Carbon credit buyers/

Interface, Inc

Named as beneficiary of 2,665,964 t CO₂e retired in 139 retirements from 43 projects · 2009-06 → 2024-07

Source: the public retirement records of GS, VCS (beneficiary named by the registry). A retirement beneficiary is not necessarily the direct purchaser of the credits, and only retirements where the registry publishes the beneficiary are counted, so the total can be lower than what the organisation retired. The quality view below is CarbonMeld's assessment of each project — not a rating of the company. Something wrong? Tell us.

What these tonnes are

  • Projects currently rated 7+/101%
  • Projects currently rated below 5/1014%
  • Projects without a current rating53%
  • Projects with a registry red flag (rejected, withdrawn…)2%
  • Projects carrying the registry's CCP label0%
  • Carbon removal projects2%
  • Projects carrying a CORSIA eligibility label1%

Shares weight each project by the tonnes this organisation retired from it: the denominator is all retired tonnes and the categories overlap — a project can carry several labels at once. They use today's registry labels and CarbonMeld assessments of the projects, not the vintage-specific certification of the retired units, and not those at the time of retirement. The unassessed share is not a quality verdict: it names projects without a current CarbonMeld assessment.

Projects retired

  1. score withdrawn
  2. 6/10
  3. 5.5/10
  4. Nouakchott 30 MW wind power plantVCS-1733Mauritania170,512 t
    score withdrawn
  5. 5.3/10
  6. 5.1/10
  7. score withdrawn
  8. score withdrawn
  9. analysis queued
  10. score withdrawn
  11. 4.8/10
  12. The Mai Ndombe REDD+ ProjectVCS-934DR Congo68,333 t
    3.4/10
  13. Southern CardamomVCS-1748Cambodia64,094 t
    2.3/10
  14. 4.9/10
  15. KARIBA REDD+ PROJECTVCS-902ZimbabweWithdrawn from the registry59,930 t
    analysis queued
  16. analysis queued
  17. score withdrawn
  18. 5/10
  19. 4.2/10
  20. 5.3/10
  21. score withdrawn
  22. ECO2 Rubber Forests GuatemalaVCS-1538Guatemala30,000 t
    analysis queued
  23. 5.5/10
  24. score withdrawn
  25. Capricorn Ridge 4 Wind FarmVCS-468United States (USA)21,600 t
    7.2/10
  26. analysis queued
  27. score withdrawn
  28. 1/10
  29. 4.1/10
  30. 5/10
  31. analysis queued
  32. analysis queued
  33. The Purus ProjectVCS-963Brazil10,500 t
    5.7/10
  34. For Peat’s SakeVCS-147710,000 t
    4.1/10
  35. analysis queued
  36. 4.8/10
  37. analysis queued
  38. Siam Cement Biomass ProjectVCS-403Thailand5,000 t
    analysis queued
  39. analysis queued
  40. score withdrawn
  41. 4/10
  42. score withdrawn
  43. analysis queued

Latest retirements

DateTonnesVintageProject
2024-07-0216,0002018Mordogan Wind Farm Project, Turkey
2024-07-029,0002018Mordogan Wind Farm Project, Turkey
2023-09-2729,7142021National Bio Energy Tongliao Biomass Power Plant
2023-09-2725,2862020National Bio Energy Tongliao Biomass Power Plant
2023-05-1566,1972020CECIC HKC Gansu Changma Wind Power project
2023-05-1520,0002019Reduced Emissions from Deforestation and Degradation in Keo Seima Wildlife Sanctuary
2023-05-1516,0002019Southern Cardamom
2023-05-1514,5342020CECIC HKC Gansu Changma Wind Power project
2023-05-151,5002019The Purus Project
2023-04-0599,0002019Reduced Emissions from Deforestation and Degradation in Keo Seima Wildlife Sanctuary
2023-04-0552,0782019Hebei Guyuan County Dongxinying 199.5 MW Wind Power Project
2023-04-0550,0002019The Kasigau Corridor REDD Project - Phase II The Community Ranches
2023-04-0545,0002019The Mai Ndombe REDD+ Project
2023-04-0530,0002019Southern Cardamom
2023-04-0520,0002019Large scale grid connected solar PV Project in Toujounine (Nouakchott)
2023-04-0510,0002019The Kasigau Corridor REDD Project - Phase II The Community Ranches
2023-04-057,5002019The Purus Project
2023-04-057,0002019Nouakchott 30 MW wind power plant
2023-04-055,0002019The Mai Ndombe REDD+ Project
2023-04-055,0002019Large scale grid connected solar PV Project in Toujounine (Nouakchott)
2023-04-054,0002019Southern Cardamom
2023-04-054,0002018 - 2019ECO2 Rubber Forests Guatemala
2023-04-052,0002019Hebei Guyuan County Dongxinying 199.5 MW Wind Power Project
2023-04-051,0002019The Purus Project
2023-04-051,0002019Nouakchott 30 MW wind power plant