Large scale grid connected solar PV Project in Toujounine (Nouakchott)
#1043of 1935 in Renewable energy#662of 1339 in Verra (VCS)#823of 1287 in ACM0002
Audit Analysis
A grid-connected solar PV project in Mauritania with a well-established methodology (ACM0002) and VVB-confirmed additionality, but undermined by significant operational issues (25 burned-out inverters, uncalibrated backup meter), numerous documentation inconsistencies across verification reports, and a project-specific baseline that lacks the robustness of a jurisdictional approach. The project is fundamentally low-risk in terms of permanence (avoidance type), but the volume of corrective actions and data quality concerns temper confidence in the reported figures.
Red Flags
- 25 inverters burned out due to grid overvoltage; 8 repairs still in progress at time of verification, creating underperformance and measurement uncertainty
- Backup meter PM5560 not calibrated; readings adjusted for 0.2% precision range, introducing measurement uncertainty into ER calculations
- Baseline method contradicts between the 2024 verification report (jurisdictional) and the 2025 verification report (project-specific), raising questions about which baseline was actually applied
- Project start date inconsistent across documents (2018-01-12 vs 2017-11-07), affecting crediting period calculations
- No FPIC conducted despite safeguards being mentioned; grievance mechanism present but community engagement documentation is absent
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2017 | 5,095 | 5,095 | 0 | |
| 2018 | 50,569 | 50,569 | 0 | |
| 2019 | 55,023 | 55,023 | 0 | |
| 2020 | 61,076 | 59,971 | 1,105 | |
| 2021 | 43,836 | 43,836 | 0 | |
| 2022 | 36,513 | 27,213 | 9,300 | |
| 2023 | 34,705 | 8,000 | 26,705 | |
| 2024 | 37,018 | 0 | 37,018 | |
| Total | 323,835 | 249,707 | 74,128 |
Risk Indicators
VVB-confirmed combined test
Avoidance project, no reversal risk
0% with quantified justification
Project-specific, method contradicts across docs
Grievance present, no FPIC
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →