Katingan Peatland Restoration and Conservation Project
Score Breakdown
Integrity
verified Additionality is confirmed by the VVB in the validation documentation, and a buffer contribution of 10% is stated in the monitoring record.
missing Fire impacts are explicitly reported (489,842 tCO2e), and inconsistencies in reversal and leakage treatment reduce confidence in permanence and net ER accounting.
Transparency
verified The monitoring report (2025) provides a clear monitoring period (2021–2023) and reports identical claimed and verified ERs for that period (5,703,688 tCO2e).
missing Contradictory ER figures and shifting leakage/reversal statements across documents reduce MRV clarity for external users.
Claim Safety
verified The project is identified as CORSIA-eligible in the extracted record, which can support certain buyer use-cases if properly communicated.
missing CORSIA eligibility increases the need for careful claims controls, and contradictions in ER and reversal/leakage reporting elevate perceived over-crediting/greenwashing risk.
Documentation
verified A large document set was used (57) including PDD, validation, monitoring, and issuance records, with high extraction confidence.
missing Presence of an “unknown” source in the evidence set and multiple contradictions suggest some recordkeeping/traceability weaknesses.
Detailed Analysis
Integrity
The validation documentation indicates additionality was confirmed by the VVB, and the project applies a project-specific baseline approach under VM0007. The monitoring report (2025) states a 10% buffer contribution, but also reports three fires that affected emission reductions by 489,842 tCO2e, indicating non-trivial disturbance risk. Leakage is presented as quantified in the monitoring report (2025) yet the leakage deduction is 0%, and earlier monitoring (2020) framed leakage as negligible, which weakens confidence in net ER conservativeness.
Transparency
The monitoring report dated 2025-06-27 clearly states the monitoring period (2021-01-01 to 2023-12-31) and reports claimed and verified emission reductions as the same value (5,703,688 tCO2e). The VVB is identified (AENOR), supporting audit traceability. However, the extracted record shows multiple inconsistencies across documents (including ER totals and reversal/leakage statements), which reduces the clarity and comparability of the public MRV narrative.
Claim Safety
The project is marked as CORSIA-eligible in the extracted record, which can increase downstream claims sensitivity and the need for precise, non-overstated marketing. Over-crediting risk is elevated by inconsistent ER figures across validation documents and by mixed messaging on reversals and leakage across monitoring reports. The absence of a stated CCP status in the extracted record leaves uncertainty for buyers seeking CCP-aligned claims.
Documentation
The evidence base is relatively strong in volume and coverage (57 documents including PDD, validation report, monitoring report, and issuance), and the minimum extraction confidence is high, suggesting the underlying documents were readable. The monitoring report is recent (2025), improving recency for the latest monitoring period. Nonetheless, the presence of an “unknown” document source and the number of contradictions indicate documentation/record consistency issues that should be resolved for higher confidence.
Overall
Key contradictions reduce confidence: (1) Additionality test type is listed as both “combined” and “investment” in validation documentation dated the same day (2016-05-06); I privilege “combined” because it is the more comprehensive framing and matches the extracted primary value, but the inconsistency still signals reporting quality issues. (2) Claimed/verified ER totals differ across validation documents (2017 vs 2019); I privilege the later (2019-07-15) figures as the more recent version, but the spread is material and increases uncertainty. (3) Reversals are contradictory: an earlier monitoring report (2020-09-29) indicates reversals were reported, while the latest monitoring report (2025-06-27) says none reported yet also describes three fires impacting ERs; I privilege the latest monitoring report for current status while treating the fire impacts as evidence of disturbance risk, lowering integrity/claim-safety. (4) Leakage justification shifts from “deemed negligible” (2020) to “quantified” (2025) while keeping a 0% deduction; I privilege the latest description but score down due to inconsistency. (5) FPIC, grievance mechanism, safeguards, and benefit sharing are supported by the 2025 monitoring report; I privilege that sourced statement over the unspecified ‘unknown’ counter-entries.
Audit Analysis
This is a VCS REDD+ avoidance project using VM0007 with VVB-confirmed additionality and a stated buffer contribution, but it also reports fire impacts that reduce credited outcomes. Several cross-document inconsistencies (especially around reversals, leakage framing, and ERR figures) increase uncertainty and raise over-crediting and communications risk.
Project Description
The Katingan Restoration and Conservation Project protects and restores 149,800 hectares of peatland ecosystems, to offer local communities sustainable sources of income, and to tackle global climate change. The project lies within the districts of Katingan and Kotawaringin Timur in Central Kalimantan Province and covers one of the largest remaining intact peat swamp forests in Indonesia. Objectives of the project includes: • GHG emission reductions through avoided deforestation and forest degradation, prevention of peat drainage and fires. • Enhance quality of life and reduce poverty of the project-zone communities by creating sustainable livelihood options and economic opportunities. • To strengthen community resilience by increasing capacity to cope with socio-ecological risks.
Red Flags
- Reversal reporting is inconsistent across monitoring reports, while the latest report also describes three fires affecting emission reductions (489,842 tCO2e).
- Leakage is stated as quantified but the leakage deduction is 0%, and earlier monitoring framed leakage as negligible—this inconsistency weakens confidence in leakage treatment.
- Large discrepancies in claimed/verified ERR figures across validation documents (2017 vs 2019) indicate data reliability issues.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2018 | 2,792,097 | 2,775,194 | 16,903 | |
| 2019 | 5,196,516 | 4,688,589 | 507,927 | |
| 2020 | 5,879,844 | 5,493,034 | 386,810 | |
| Total | 13,868,457 | 12,956,817 | 911,640 |
Cosa migliorerebbe questo punteggio
- Publish a clear reconciliation table across all periods showing claimed vs verified ERs, treatment of fire impacts, and how any reversals were handled (including buffer interactions).
- Provide a consistent, quantified leakage assessment that explains why the leakage deduction is 0% and aligns language across monitoring reports, plus disclose baseline reassessment timing.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed additionality (test type inconsistently described)
Buffer stated (10%) but fire impacts reported and reversal reporting inconsistent
0% deduction with inconsistent justification across monitoring reports
Project-specific baseline; reassessment timing not found
FPIC and grievance mechanism documented in latest monitoring report
CORSIA-eligible; CCP status not stated
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Registry Documents
issuance
- VCS Issuance Representation Single Representor v3 5July2017 signed DH RK.pdf
- VCS-Issuance-Representation-PT. Rimba Makmur Utama-v4.1.pdf
- ISS_REP_1477_12JAN2022.pdf
- Issuance Verification 2019_07_15 .pdf
- IssuanceThirdVerification RK DH signed .pdf
- VCS Issuance Representation Single Representor v3.4 Signed.pdf
monitoring
Other
validation
- 010-Katingan_VCS Verification Representation_Final_20170707.pdf
- VCS_PTRMU_Katingan_Validation_Representation_050616.pdf
- 010_03-Katingan VCS Verification Representation_Final_20201009.pdf
- VERIF_REP_1477_01JAN2020_31DEC2020.pdf
- VCS_PTRMU_Katingan_Verification_Representation_101416.pdf
- 010_01_Katingan CCB Verification_Statement_final-10Aug2018.pdf
- +12 more
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →