Florestal Santa Maria Project
Score Breakdown
Integrity
verified Additionality confirmed by an independent VVB in the monitoring/validation materials (monitoring report 2024; validation report 2025).
missing Large contradictory verified ERR figures across validation reports (402,312.98 vs 6,076,632) and multiple corrective actions, indicating reliability issues.
Transparency
verified VVB named (Earthood Services Limited) and monitoring period disclosed (2019-04-13 — 2022-04-12); methodology and buffer pool percentage stated.
missing Total ERR claimed not published / contradictory and several required MR clarifications (per corrective actions), reducing transparency of key numbers.
Claim Safety
verified Leakage is described as quantified in the monitoring report (2024), and a 10% buffer pool is documented in later validation materials.
missing Missing explicit leakage deduction percentage and contradictions in baseline/additionality across older and newer documents raise over-crediting risk.
Documentation
verified A relatively large document set (21 documents listed) and a named VVB with recent monitoring and validation reports (2024–2025).
missing Numerous corrective actions and NCRs listed in the monitoring report, and several fields remain unstated in extracted records (e.g., total ERR claimed, leakage deduction %).
Detailed Analysis
Integrity
The monitoring report (2024) and a validation report (2025) confirm additionality via an investment test and the presence of a buffer pool (10%), and the project uses a project-specific baseline method last reassessed in 2019. However, there is a major contradiction in total verified reductions between earlier and later validation reports (402,312.98 in 2025 vs 6,076,632 in 2021) and multiple corrective actions/NCRs are required in the monitoring report (listed items and NCR 01/12–07/12). Leakage is described as quantified in the 2024 monitoring report but a leakage deduction percentage is not provided in the extracted record. These reliability and documentation issues reduce the integrity score.
Transparency
Positive elements: VVB is named (Earthood Services Limited), monitoring period and methodology (VM0007 v1.6) are disclosed, and the registry is VCS. Negative elements: the total ERR claimed is not stated in the extracted data, the total verified ERR shows large contradictory values across documents, and the monitoring report flags many template and transparency shortfalls (per corrective actions). Extraction confidence is high, so gaps are likely omissions in source documents rather than extraction errors, which lowers transparency.
Claim Safety
There is a quantified leakage justification reported in the monitoring report (2024) and a buffer pool is documented (10% in later validation materials), which reduces some over-claim risk. Offsetting risk remains because the leakage deduction percentage is absent from the extracted record, the baseline is project-specific rather than jurisdictional, and the catastrophic contradiction in verified ERR figures suggests possible over- or under-crediting historically. CORSIA/CCP status is not stated, so dual-claim risk cannot be fully assessed.
Documentation
Documentation breadth is reasonable (21 documents, evidence list includes PDD, monitoring report, validation report, issuance). Extraction confidence is high. However, the monitoring report (2024) lists many corrective actions and NCRs indicating non-conformities with VCS monitoring template requirements, and several fields remain unstated across the record (total ERR claimed, leakage deduction %, usage monitoring). VVB appears independent but multiple older documents conflict with newer ones, requiring reconciliation.
Overall
I privileged the most recent and higher-priority verification/monitoring documents (monitoring report 2024 and validation report 2025) over older documents (2012–2021) when resolving contradictions because they are later and explicitly address monitoring period issues; for example, the 2025 validation record indicates a 10% buffer pool and a total verified ERR of 402,312.98 which I treated as the operative figures over older, inconsistent values. Nevertheless, the presence of contradictory entries across validation/monitoring documents (buffer pool 10% vs 13.5%; reversal events reported vs not addressed; additionality verified vs not verified; large discrepancies in total ERR) and the long list of corrective actions meaningfully reduce confidence. Scores were lowered to reflect these reliability and documentation concerns; further reconciliation and corrected issuance/monitoring reports would be required to raise the ratings.
Audit Analysis
The project shows basic integrity controls (VVB involvement, buffer pool, quantified leakage justification and FPIC) but multiple contradictory figures across documents and a long list of corrective actions/NCRs reduce confidence. Key outcome figures (total verified reductions) and some governance items are inconsistent between documents, raising moderate risk of over-crediting or poor implementation.
Project Description
The FSM-REDD Project, proposed by Florestal Santa Maria S/A, is located in Colniza Municipality, Mato Grosso, Brazil, and aims to combat the intense deforestation pressure in the region. The project estimates the avoidance of 29,923,331 tCO2 throughout 30 years by protecting 71,714 hectares of native forest on private land owned by FSM. The project also promotes local socio-environmental development through partnerships with a neighboring State Park and Colniza City Hall for education initiatives.
Red Flags
- Large contradiction in total verified emissions/removals (402,313 vs 6,076,632) undermines ERR reliability
- Multiple non-conformities and corrective actions (NCR 01/12 to NCR 07/12) in the monitoring report
- Leakage treatment described as quantified but leakage deduction percentage is not stated in available documents
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2009 | 572,360 | 568,640 | 3,720 | |
| 2010 | 820,000 | 820,000 | 0 | |
| 2011 | 1,000,238 | 1,000,229 | 9 | |
| 2012 | 891,042 | 616,986 | 274,056 | |
| 2013 | 938,808 | 608,987 | 329,821 | |
| 2014 | 498,968 | 104,094 | 394,874 | |
| 2015 | 843,341 | 369,719 | 473,622 | |
| 2016 | 826,330 | 139,302 | 687,028 | |
| 2017 | 1,423,159 | 40,000 | 1,383,159 | |
| 2018 | 402,338 | 87,620 | 314,718 | |
| 2019 | 314,841 | 314,841 | 0 | |
| 2020 | 16,261 | 16,261 | 0 | |
| 2021 | 94,245 | 75,240 | 19,005 | |
| Total | 8,641,931 | 4,761,919 | 3,880,012 |
Cosa migliorerebbe questo punteggio
- Reconcile contradictory ERR/issuance figures across validation and monitoring reports and publish a corrected, reconciled total ERR (with source/version and date).
- Disclose the leakage deduction percentage and respond to each NCR in a corrective action report showing fixes and evidence, plus clarify any methodology deviations.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed but contradicted earlier
buffer pool present; some reversal concerns
quantified but deduction % not stated
project baseline; reassessed 2019
FPIC and grievance noted but inconsistently reported
CORSIA/CCP status not stated
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →