BLUE CARBON PROJECT GULF OF MORROSQUILLO “VIDA MANGLAR”
#54of 261 in Soil carbon#37of 124 in Colombia#512of 1339 in Verra (VCS)#4of 27 in VM0007
Audit Analysis
The Vida Manglar blue carbon project in Colombia demonstrates a functional VCS ALM structure with a 14% buffer pool, no reversal events, and confirmed additionality by AENOR. However, a significant leakage contradiction (0% in the validation report versus 15% in the PDD), the use of a CDM Tool instead of the required VMD0052 positive list for additionality, and 14 outstanding corrective actions—including calculation errors in the carbon estimation spreadsheet—materially weaken confidence in the integrity and claim safety of the credits.
Red Flags
- Leakage deduction contradiction: the PDD (2021-04-07) proposed a 15% leakage deduction, but the validation report (2021-04-08) accepted 0%; the verification report later describes the justification as 'quantified' without reconciling the 15% figure, creating uncertainty about whether leakage was properly accounted for.
- Additionality demonstration relied on a CDM Tool rather than the VMD0052 positive list required by the VCS methodology, as flagged in the verification report's material findings.
- Calculation errors were identified in the carbon estimation spreadsheet and required corrective action, raising questions about the accuracy of reported ERR figures.
- The Benefit Sharing System was described as 'under construction' and deferred to future verifications, meaning community benefit commitments were not yet operational at the time of verification.
- Additionality test type is inconsistent across documents: the validation report (2021-04-08) records a 'barrier' test while the verification report (2021-05-06) records a 'combined' test.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2015 | 8,990 | 8,990 | 0 | |
| 2016 | 15,619 | 13,980 | 1,639 | |
| 2017 | 16,594 | 16,594 | 0 | |
| 2018 | 18,160 | 17,805 | 355 | |
| Total | 59,363 | 57,369 | 1,994 |
Risk Indicators
VVB-confirmed but CDM Tool used instead of VMD0052
14% buffer pool, no reversal events
0% deduction contradicts PDD's 15% proposal
Project-specific baseline, reassessment not yet due
FPIC conducted, grievance mechanism present
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →