Skip to main content
VCSAgriculture Forestry and Other Land UseColombia Registry: RegisteredVM0007

BLUE CARBON PROJECT GULF OF MORROSQUILLO “VIDA MANGLAR”

VCS-2290 ↗

#54of 261 in Soil carbon#37of 124 in Colombia#512of 1339 in Verra (VCS)#4of 27 in VM0007

5.3/ 10
Integrity
5.5
Transparency
5.5
Claim Safety
5.0
Documentation
5.0

Audit Analysis

The Vida Manglar blue carbon project in Colombia demonstrates a functional VCS ALM structure with a 14% buffer pool, no reversal events, and confirmed additionality by AENOR. However, a significant leakage contradiction (0% in the validation report versus 15% in the PDD), the use of a CDM Tool instead of the required VMD0052 positive list for additionality, and 14 outstanding corrective actions—including calculation errors in the carbon estimation spreadsheet—materially weaken confidence in the integrity and claim safety of the credits.

Red Flags

  • Leakage deduction contradiction: the PDD (2021-04-07) proposed a 15% leakage deduction, but the validation report (2021-04-08) accepted 0%; the verification report later describes the justification as 'quantified' without reconciling the 15% figure, creating uncertainty about whether leakage was properly accounted for.
  • Additionality demonstration relied on a CDM Tool rather than the VMD0052 positive list required by the VCS methodology, as flagged in the verification report's material findings.
  • Calculation errors were identified in the carbon estimation spreadsheet and required corrective action, raising questions about the accuracy of reported ERR figures.
  • The Benefit Sharing System was described as 'under construction' and deferred to future verifications, meaning community benefit commitments were not yet operational at the time of verification.
  • Additionality test type is inconsistent across documents: the validation report (2021-04-08) records a 'barrier' test while the verification report (2021-05-06) records a 'combined' test.

Credit Vintages

IssuedRetiredAvailable
2015
8,9908,9900
2016
15,61913,9801,639
2017
16,59416,5940
2018
18,16017,805355
Total59,36357,3691,994

Risk Indicators

Additionality

VVB-confirmed but CDM Tool used instead of VMD0052

Permanence

14% buffer pool, no reversal events

Leakage

0% deduction contradicts PDD's 15% proposal

Baseline

Project-specific baseline, reassessment not yet due

Safeguards

FPIC conducted, grievance mechanism present

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-08VM0007

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents