Skip to main content
VCSAgriculture Forestry and Other Land UseParaguay Registry: RegisteredVM0007

The Paraguay Forest Conservation Project - Reduction of GHG emissions from deforestation and forest degradation in the Chaco-Pantanal ecosystem

VCS-953 ↗

#205of 261 in Soil carbon#7of 8 in Paraguay#1181of 1339 in Verra (VCS)#22of 27 in VM0007

3.9/ 10
Integrity
3.5
Transparency
4.5
Claim Safety
4.0
Documentation
4.0

Audit Analysis

The Paraguay Forest Conservation Project has a VVB-verified additionality assessment and a 10% buffer pool, but is severely undermined by an extensive record of non-conformity reports (16+ NCRs across multiple verification cycles), fundamental calculation errors in carbon stock estimation, and major contradictions in key figures including leakage deduction (0.4% vs 40%) and verified ERR (11,706 vs 63,669 tCO2e). The project-specific baseline and the volume of corrective actions required raise significant concerns about the robustness of the credit claims.

Red Flags

  • 16+ Non-Conformity Reports (NCRs) across 2012 and 2013 verification cycles, including errors in allometric equations, root-to-shoot ratios, uncertainty calculations, and missing methodology parameters
  • Leakage deduction contradicts between documents: 0.4% in the 2013 verification report vs 40% in the 2021 monitoring report — a 100-fold discrepancy that fundamentally changes the net credit value
  • Verified ERR of 11,706 tCO2e in the 2016 verification report vs 63,669 tCO2e in the 2021 monitoring report for overlapping periods, suggesting a 3–5× inconsistency in annual emission reduction rates
  • Carbon inventory had to be re-executed in 2013 to include additional carbon pools (non-tree woody biomass, dead wood, litter), and deforestation proxy areas were doubled from six to twelve during revision
  • 28+ corrective actions required by the VVB, including recalculation of carbon stocks, correction of allometric equations, and revision of baseline and project scenario calculations

Credit Vintages

IssuedRetiredAvailable
2011
7,60107,601
2012
11,706011,706
2013
13,377013,377
2014
13,758013,758
2015
14,138014,138
2016
14,519014,519
2017
14,899014,899
Total89,998089,998

Risk Indicators

Additionality

VVB-verified combined test

Permanence

10% buffer, minor fire events

Leakage

Quantified but 100× contradiction

Baseline

Project-specific, reassessed 2016

Safeguards

FPIC, grievance mechanism present

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-04VM0007

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents