Skip to main content
VCSForestryCongo, The Democratic Republic of the Registry: RegisteredVM0009

The Mai Ndombe REDD+ Project

VCS-934 ↗

#11of 66 in Soil carbon#259of 629 in Verra (VCS)

5.6/ 10
Integrity
6.0
Transparency
5.5
Claim Safety
4.5
Documentation
6.5

Audit Analysis

The project shows several positive controls: a VVB-confirmed investment additionality test, a jurisdictional baseline in recent documents, FPIC and a grievance mechanism, and no material findings. However, multiple contradictions across key fields (buffer pool size, baseline type, reversal treatment, and verified ERR) and some missing quantified inputs reduce confidence and increase risk of over-crediting.

Red Flags

  • Conflicting total verified emissions removal figures (3,398,286 vs 10,773,562) across validation reports
  • Inconsistent buffer pool percentage reported (25% vs 16%) and contradictory treatment of reversals
  • Leakage justification contradictory within monitoring documents (both 'quantified' and 'not addressed')

Credit Vintages

IssuedRetiredAvailable
2012
472,355466,8205,535
2015
1,374,124992,123382,001
2016
1,018,560492,771525,789
2017
1,783,527722,4181,061,109
2018
6,876,0932,918,8203,957,273
2019
3,640,6952,079,8621,560,833
2020
3,927,4983,399,374528,124
2021
5,808,4005,708,400100,000
2022
5,208,9045,208,9040
Total30,110,15621,989,4928,120,664

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

buffer present but contradictory

Leakage

quantified but inconsistent/0% deduction

Baseline

jurisdictional reported but earlier project baseline exists

Safeguards

FPIC and grievance present

Double-claim

CORSIA/CCP status not stated

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-04-23VM0009

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents