‘Guanaré’ Forest Plantations on Degraded Grasslands Under Extensive Grazing
Score Breakdown
Integrity
verified Additionality confirmed by the VVB (SCS Global Services) in the monitoring/verification package (monitoring report, 2019).
missing Reversal treatment not consistently documented: monitoring report (2019) states reversal events 'not addressed' while a later validation report (2021) states 'none reported' — this contradiction reduces confidence.
Transparency
verified Monitoring period is provided (2013-01-12 — 2018-12-31) and a clear set of evidence documents is listed including monitoring and validation reports (monitoring report, 2019; validation report, 2021).
missing Critical quantitative items are absent from extracted records (no buffer pool percentage, no verified/claimed ERR totals, no leakage deduction percent), limiting verifiability.
Claim Safety
verified Project baseline is project-specific and additionality was subjected to an investment test as confirmed by VVB (monitoring report, 2019).
missing Leakage treatment is inconsistent across documents (monitoring report deems leakage negligible; validation report earlier stated leakage was quantified), raising over-crediting risk and lowering claim safety.
Documentation
verified Large evidence set reported (40 documents used) and extraction confidence is high; monitoring report dated 2019 and validation report dated 2021 are available.
missing Several required data fields are missing from the extracted record (buffer %, ERR totals, grid emission factors), which weakens completeness.
Detailed Analysis
Integrity
Additionality was confirmed by the VVB (SCS Global Services) as documented in the monitoring/verification package (monitoring report, 2019). The project uses a project-specific baseline under AR-ACM0001 (methodology version 05.2.0) and reports no material findings or corrective actions in the monitoring report (2019). However, the monitoring report states that reversal events are 'not addressed' while a later validation report (2021) reports 'none reported' for reversals; this contradiction undermines confidence in non-permanence treatment. Buffer pool percentage and leakage deduction are not reported in the extracted record, so permanence and leakage mitigation cannot be fully verified.
Transparency
The project has a named VVB, explicit monitoring period (2013–2018) and a sizable evidence corpus including PDD, validation, monitoring and issuance documents (40 documents listed), and the extraction confidence is high. Despite that, key quantitative disclosures are missing from the extracted facts: no buffer pool percentage, no total ERR claimed or verified, no leakage deduction percent, and no grid emission factor — these gaps limit transparency and independent auditability.
Claim Safety
The project uses an investment additionality test confirmed by the VVB, which supports the credibility of claims. But inconsistencies on leakage treatment (monitoring report calls leakage 'deemed negligible' while an earlier validation record indicated leakage was quantified) and the absence of reported leakage deductions increase the risk of over-crediting. CORSIA/CCP eligibility and explicit double-claim safeguards are not stated in the extracted record, so dual-claim risk cannot be ruled out.
Documentation
Documentation volume and recency are strengths: monitoring report dated 2019 and a validation report dated 2021 are present, and extraction confidence is high. The VVB is named and no material findings or corrective actions were listed in the monitoring output. Nonetheless, missing numeric disclosures (buffer percentage, ERR totals, verified leakage deduction) indicate incomplete extraction or incomplete public reporting.
Overall
I privileged the more recent validation report (2021) over the older monitoring report where they contradicted on reversal events because a later validation outcome often reflects subsequent checks; therefore I treated reversals as 'none reported' for conservative interpretation. For leakage justification there is a contradiction: the monitoring report (2019) states leakage was 'deemed negligible' while the earlier validation report (2012) stated leakage was 'quantified'. I privileged the monitoring report (2019) for leakage rationale because it is more recent and likely reflects updated project practice, but the inconsistency itself reduces confidence. Additionality test type is inconsistent within monitoring-stage documents (an 'investment' test vs 'combined'); conservatively I treat the test as effectively weaker (combined/unclear). These contradictions and several missing quantitative disclosures are the main drivers pulling the overall score down to 5.4 — the project has some positive elements but key transparency and consistency gaps limit confidence and raise moderate risk of over-crediting.
Audit Analysis
The project shows some strengths: a VVB (SCS Global Services) confirmed additionality and there is a recent monitoring report (2019) and validation report (2021). However key elements are missing or contradictory (buffer, leakage deduction, ERR figures and reversal treatment), which reduces confidence in the integrity and claim safety of issued credits.
Project Description
The main objectives of the project are wood production, land restoration and carbon sequestration through afforestation. All practices follow FSC standard for sustainable forest management, while enhancing biodiversity conservation by increasing the connectivity of forests and generating income and job opportunities for local communities/ rural areas of Uruguay. The project comprises a total of 18,576 hectares of land previously under extensive grazing by beef cattle, on which forest plantations for obtaining high-value, long-lived timber products and for sequestering large amounts of carbon dioxide from the atmosphere were established. The total area affected by the project is 33,225 hectares, if we include buffer zones, grasslands and native forests. Forests were based mainly on Eucalyptus grandis and to a lesser extent Eucalyptus dunnii, Eucalyptus tereticornis and Pinus taeda plantations in 16 to 22-year rotations, managed with pruning (to a minimum height of 12 m) and two to three thinning operations, to obtain knot-free, high-diameter logs suitable for saw-milling and veneering. Plantation is already completed, and forests will be replanted after clear-cut harvest. Guanaré first areas were planted in 2006 and the last ones in 2011. Practices will be compatible with FSC standard for sustainable forest management. Planted forests will remove carbon dioxide from the atmosphere and store it in different carbon pools (living above-ground and below-ground biomass, soil, litter, non-tree vegetation, dead wood and harvested wood products).
Red Flags
- No buffer pool percentage reported in available documents
- Contradictory statements on reversal treatment and leakage justification between validation and monitoring documents
- Buffer pool size not disclosed in available documents
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2015 | 580,285 | 472,149 | 108,136 | |
| 2016 | 456 | 456 | 0 | |
| 2017 | 132,452 | 0 | 132,452 | |
| 2018 | 82,576 | 78,536 | 4,040 | |
| Total | 795,769 | 551,141 | 244,628 |
Cosa migliorerebbe questo punteggio
- Publish and extract the buffer pool percentage and any reversal risk calculation used in the non-permanence assessment.
- Resolve contradictions by providing a clear, reconciled statement on reversal treatment and leakage (with quantified leakage deductions if applicable) and a single, explicit description of the additionality test applied.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed additionality
buffer/ reversals unclear
justified but inconsistent
project-specific baseline
FPIC and grievance mechanism present
CORSIA/CCP status not stated
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Registry Documents
issuance
monitoring
- 202100908 Buffer Request- MR-V11 Sept 2021-- FINAL DRAFT2- CCB_VCS_Monitoring_Report_Template_CCBv3.0-_VCSv3.4-GUANARE PROJECT.pdf
- 20210317 MR-V8 Feb 2021-- FINAL DRAFT2- CCB_VCS_Monitoring_Report_Template_CCBv3.0-_VCSv3.4-GUANARE PROJECT.pdf
- MONIT_REP_959_24APR2006_12JAN2013.pdf
- 20210409 MR-V9 April 2021-- FINAL DRAFT2- CCB_VCS_Monitoring_Report_Template_CCBv3.0-_VCSv3.4-GUANARE PROJECT.pdf
- FINAL DRAFT- CCB_VCS_Monitoring_Report_Summary_SPANISH.pdf
- FINAL DRAFT- CCB_VCS_Monitoring_Report_Template_CCBv3.0-_VCSv3.4-GUANARE PROJECT10082020.pdf
Other
- PADRONES_CARBONO_GUANARE.kml
- FINAL DRAFT - GUANARE CCB_Project_Description_Summary_SPANISH.pdf
- VCS Registration Deed of Representation - Single Representor (Guanare SA) v4.1 _1.Sep.2020.pdf
- 3_Guanare_VCS_validation_statement.pdf
- AFOLU_ELEM_959_24APR2006_12JAN2013.pdf
- 2_Guanaré_VCS_validation_report.pdf
- +4 more
pdd
validation
- CCB_Carbosur_Guanare_Validation_Report_v1-9_04052021.pdf
- VCS_Carbosur_Guanare_Verification_Representation_081020.pdf
- VERIF_STA_959_24APR2006_12JAN2013.PDF
- CCB_VCS_Carbosur_Guanare_Verification_Report_04052021.pdf
- CCB_Carbosur_Guanare_Validation_Report_v1-7_062920.pdf
- CCB_Carbosur_Guanare_Validation_Statement_062920.pdf
- +9 more
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →