Lumin/Eucapine Uruguay Forest Plantations On Degraded Grasslands Under Extensive Grazing
Score Breakdown
Integrity
verified VVB (SCS Global Services) confirmed additionality in the monitoring report and no material findings were reported in the verification/monitoring report
missing Baseline reassessment not stated and leakage justification not addressed despite a 0% leakage deduction (monitoring report)
Transparency
verified Monitoring period and a named VVB are provided; registry is VCS and 28 documents were used (monitoring report, validation report, PDD, issuance)
inferred Unreported/unknown values: total emissions claimed/verified and grid emission factor not found in extracted record
Claim Safety
missing Contradiction on additionality: validation report (2023-09-26) indicates a common-practice test, which weakens additionality confidence relative to the monitoring report (2021)
missing 0% leakage deduction with either no justification or inconsistent justification in the monitoring report raises over-crediting risk
Documentation
verified Multiple evidence documents (PDD, monitoring report, validation report, issuance) and high extraction confidence; monitoring report dated 2021-04-07
inferred Some key fields (total ER claimed/verified, grid EF, usage rates, baseline reassessment) are not stated in the extracted record
Detailed Analysis
Integrity
The monitoring report (2021-04-07) and verification by SCS indicate additionality via an investment test and no material findings were reported, and a 10% buffer pool is applied. However, the project-specific baseline is not stated to have been reassessed, and leakage justification is reported as not addressed in the monitoring report while a 0% leakage deduction is applied. These gaps and the contradiction around reversal events (same monitoring report contains conflicting entries) lower the integrity score.
Transparency
Transparency is moderate: the VVB is named (SCS Global Services), the monitoring period is provided (2013-04-08 — 2020-12-31), and multiple documents (PDD, monitoring report, validation report, issuance) were used with high extraction confidence. Important numeric fields such as total emissions claimed/verified and grid emission factor are not found in the extracted record, reducing traceability for independent reviewers.
Claim Safety
There is a meaningful risk of over-crediting. The monitoring report applies a 0% leakage deduction but provides no clear justification in the extracted text, and there is an explicit contradiction about whether leakage was deemed negligible. Crucially, the validation report (2023-09-26) indicates the additionality assessment used common-practice rather than an investment test, which weakens the project's additionality claim compared with the monitoring report — we privilege the later validation report for that field and downgrade claim safety accordingly.
Documentation
Documentation quality is relatively strong: 28 documents were used, evidence includes PDD, monitoring report (2021), validation report (2023), and issuance records, and the minimum extraction confidence is high. The VVB is independent and no corrective actions were required. Nonetheless, several specific quantitative items are missing from the extracted record (e.g., total ER claimed/verified, grid EF), preventing full transparency.
Overall
Overall score reflects decent documentation and some integrity features (VVB verification, buffer pool, safeguards and FPIC recorded in the monitoring report) but is pulled down by mixed or missing evidence on leakage, baseline reassessment, and a key contradiction on additionality between the monitoring report (2021) and the later validation report (2023). For contradictions: where the validation report is more recent (additionality) we privilege the validation report; for most other fields (safeguards, grievance mechanism, benefit sharing, reversal treatment) the monitoring report (2021) is the only document asserting positive practice and is privileged because the alternative sources are older/unknown. These inconsistencies reduce confidence and are reflected in lower integrity and claim-safety subscores.
Audit Analysis
The project shows several positive integrity features (VVB verification, a buffer pool, no material findings) and reasonably complete documentation. However, missing baseline reassessment, an unexplained 0% leakage deduction, and contradictions between documents (notably on additionality and leakage) reduce confidence and increase over-crediting risk.
Project Description
The Lumin/Eucapine Uruguay Forest Plantations project will transform 18,988 ha of previously grazed land into a carbon-sequestering forest. The project will also produce high-value, long-lived timber products. The project was previously known as Weyerhaeuser Uruguay Forest Plantations and underwent a name change in September 2022.
Red Flags
- Contradiction on additionality test: monitoring report states an investment test but validation report (2023) indicates common-practice — raises doubt about additionality robustness
- Leakage justification is either not addressed or inconsistently described while a 0% leakage deduction is applied
- Leakage not addressed in project documentation
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2006 | 358 | 358 | 0 | |
| 2007 | 6,024 | 6,024 | 0 | |
| 2008 | 20,628 | 20,628 | 0 | |
| 2009 | 144,338 | 103,494 | 40,844 | |
| 2010 | 291,357 | 238,009 | 53,348 | |
| 2011 | 312,240 | 241,812 | 70,428 | |
| 2012 | 1,123,077 | 237,389 | 885,688 | |
| 2015 | 407,724 | 407,724 | 0 | |
| 2016 | 377,191 | 312,276 | 64,915 | |
| 2017 | 548,824 | 0 | 548,824 | |
| 2018 | 512,971 | 0 | 512,971 | |
| 2019 | 615,715 | 314,029 | 301,686 | |
| 2020 | 717,339 | 617,424 | 99,915 | |
| Total | 5,077,786 | 2,499,167 | 2,578,619 |
Cosa migliorerebbe questo punteggio
- Provide clear, documented justification for the 0% leakage deduction or apply an appropriate leakage deduction with supporting analysis
- Resolve the additionality contradiction by publishing the validation and monitoring reconciliation (explain test used) and disclose baseline reassessment records and any updates
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
conflicting additionality
buffer present but contradictions
0% deduction, justification inconsistent
project baseline; reassessment not stated
FPIC & grievance reported
CORSIA/CCP status not stated
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Registry Documents
monitoring
Other
- Weyerhaeuser-Eucapine N960- Project Area.kml
- Cadastral_Unit_Weyerhaeuser-Eucapine_N960-_Project_Area.kml
- Rodales_Weyerhaeuser-Eucapine_N960-_Project_Area.kml
- V10_VCS-Non-Permanence-Risk-Report-LUMIN_20230919.pdf
- Summary ESPANOL PD- 20210526- LUMIN.pdf
- 3_Weyerhaeuser_Uruguay_VCS_valid_statement_13.pdf
- +3 more
pdd
validation
- VCS_Lumin_Eucapine_VerificationRepresentationv4.2_111121.pdf
- VERIF_STA_960_22FEB2006_07APR2013.pdf
- 2_Weyerhaeuser_Uruguay_VCS_validation_report.pdf
- 4_Weyerhaeuser_Uruguay_VCS_validation_deed_of_representation.pdf
- CCB_VCS_Lumin_Eucapine_Verification_Report__V3-0_092623.pdf
- VALID_REP_960_04JAN2013.pdf
- +4 more
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →