Skip to main content
VCSAgriculture Forestry and Other Land UseNicaragua Registry: RegisteredAR-ACM0001

EcoPlanet Bamboo Central America - Reforestation Project

VCS-1085 ↗

#147of 261 in Soil carbon#4of 6 in Nicaragua#993of 1339 in Verra (VCS)#6of 8 in AR-ACM0001

4.5/ 10
Integrity
4.5
Transparency
4.5
Claim Safety
5.0
Documentation
4.0

Audit Analysis

The EcoPlanet Bamboo reforestation project in Nicaragua has a verified additionality assessment and a 10% buffer pool, but is undermined by 27 material findings, 26 corrective actions, and multiple internal contradictions in the verification report (leakage justification, reversal-event status, ERR figures). The project delivered roughly 60% of its pro-rata ex-ante expectation for the elapsed monitoring period, which is conservative, but the methodology applicability question (bamboo as forest vs. revegetation) and the unresolved FPIC contradiction raise structural concerns about the integrity of the credit claim.

Red Flags

  • 27 material findings and 26 corrective actions across the verification and monitoring reports, including missing non-permanence risk report, allometric equation inconsistencies, and sample-size discrepancies (75 vs 84 plots)
  • FPIC status contradicts between the 2014 verification report (conducted) and the 2021 verification report (not conducted), leaving the free, prior, and informed consent of local stakeholders unresolved
  • Leakage justification is internally contradictory within the same 2021 verification report: one section states 'deemed negligible' while another references a 'quantified' deduction, yet the applied deduction is 0%
  • Methodology applicability NCR: the VVB questioned whether bamboo qualifies as 'forest' under AR-ACM0001, requiring the proponent to provide the FAO forest definition to justify applicability
  • Low extraction confidence across the document set, meaning at least one key document was poorly readable and the reliability of extracted figures is reduced

Credit Vintages

IssuedRetiredAvailable
2011
34,15634,1560
2014
229,270228,699571
Total263,426262,855571

Risk Indicators

Additionality

VVB-confirmed barrier test

Permanence

Buffer pool present; non-permanence report initially missing

Leakage

0% deduction; contradictory justification in same report

Baseline

Project-specific; reassessment timing not recorded

Safeguards

FPIC status contradicted; grievance mechanism present

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-09AR-ACM0001

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents