Skip to main content
VCSAgriculture Forestry and Other Land UseUruguay Registry: RegisteredAR-ACM0001

‘El Arriero ’ Afforestation on degraded grasslands under extensive grazing project

VCS-961 ↗

#55of 94 in Soil carbon#6of 10 in Uruguay#619of 857 in Verra (VCS)

4.8/ 10
Integrity
4.8
Transparency
4.5
Claim Safety
4.3
Documentation
6.0

Audit Analysis

The 'El Arriero' afforestation project in Uruguay has a VVB-verified combined additionality test and a 10% buffer pool, but is undermined by a 0% leakage deduction justified only as 'deemed negligible' (despite a material finding on displaced grazing), a project-specific baseline whose 10-year reassessment is now overdue, and a contradiction in the most recent verification report stating FPIC was not conducted. Significant ERR figure discrepancies between successive monitoring reports (681,488 in 2023 vs. 257,203 in 2024) raise data-reliability concerns that temper confidence in the verified credit volume.

Red Flags

  • FPIC recorded as not conducted in the most recent verification report (2024-04-06), contradicting an earlier report (2023-01-17) that recorded it as conducted
  • Leakage deduction of 0% justified as 'deemed negligible' while a material finding explicitly flagged the need to clarify how displaced grazing activities were assessed
  • Verified ERR dropped from 681,488 tCO2e (2023 monitoring report) to 257,203 tCO2e (2024 monitoring report), a 62% reduction, with no clear explanation in the extracted record
  • Baseline reassessment overdue: project started April 2009, the 10-year VCS ALM reassessment was due by April 2019, and no reassessment date appears in any available document
  • Reversal events recorded as 'reported' in the 2018 verification report but 'not addressed' in the 2026 verification report, leaving the status of any past reversals unclear

Credit Vintages

IssuedRetiredAvailable
2009
27,54721,0936,454
2013
1,103,673829,625274,048
2018
613,339360,666252,673
2021
1000100
Total1,744,6591,211,384533,275

Risk Indicators

Additionality

VVB-verified combined test

Permanence

Buffer pool present; reversal status contradictory

Leakage

0% deduction; justification weakened over time

Baseline

Project-specific; 10-yr reassessment overdue

Safeguards

Grievance & benefit-sharing present; FPIC not conducted

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-31AR-ACM0001

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents