Vai al contenuto principale
VCS avoidance India Vintage 2016, 2017 Registry: Verification approval requested Documentazione completa General Methodology v2.0

Solar Grouped Project By Acme Group (Ekiesl-VCS-Aug-16-01)

VCS-1580 ↗

5.0 / 10
Integrity
5.2
Transparency
5.6
Claim Safety
4.8
Documentation
4.1

Score Breakdown

Integrity

verified Additionality was confirmed by the VVB using an investment test (monitoring report, 2023-08-17).

missing Leakage was not addressed and no leakage deduction is evidenced in the extracted record, despite ACM0002 requiring explicit leakage consideration (monitoring report, 2023-08-17).

Transparency

verified Key project attributes are disclosed (VVB: LGAI/Applus+, methodology ACM0002 v17.01, monitoring period 2022-05-01 to 2023-01-31) (monitoring report, 2023-08-17).

missing Extensive CARs and missing monitoring evidence (e.g., meter calibration certificates, complete JMRs/invoices, missing supporting contracts/certificates) reduce MRV transparency (monitoring report, 2023-08-17).

Claim Safety

verified The project is stated as not CORSIA-eligible, reducing aviation-claim channel risk (monitoring report, 2023-08-17).

missing ER numbers are inconsistent across documents and include a higher verified value than another stated verified/claimed value, elevating over-crediting/greenwashing risk (validation reports 2022-10-10; 2023-09-12; monitoring reports 2021-04-23; 2022-09-28).

Documentation

verified A relatively large document set was available (29 documents including PDD, validation, monitoring, issuance) with high extraction confidence.

missing The monitoring report lists many missing or corrected documents and repeated CARs, indicating incomplete/weak documentation at assessment time (monitoring report, 2023-08-17).

Detailed Analysis

Integrity

Additionality is relatively strong on paper: the monitoring report indicates an investment-test additionality argument and that it was confirmed by the VVB (monitoring report, 2023-08-17). However, the baseline is project-specific and the timing of any baseline reassessment is not found in the extracted record, which weakens robustness for a long crediting period (2015-06-22 to 2025-06-21). Leakage is explicitly not addressed in the extracted record and no leakage deduction is evidenced, which is a material integrity gap for ACM0002-style accounting (monitoring report, 2023-08-17).

Transparency

Core MRV descriptors are present (methodology ACM0002 v17.01, grid emission factor 0.9777, monitoring period 2022-05-01 to 2023-01-31, VVB identified as LGAI/Applus+) (monitoring report, 2023-08-17). Transparency is reduced by the volume of corrective actions and requests for missing evidence (e.g., complete JMRs/invoices, calibration certificates, commissioning/PPA/O&M documents, breakdown/location details), which suggests the monitoring package was not audit-ready initially (monitoring report, 2023-08-17). In addition, contradictions in key fields (ER totals, safeguards/grievance) reduce confidence that public-facing statements are consistent across the record.

Claim Safety

The project is stated as not CORSIA-eligible, which lowers the risk of problematic aviation-aligned claims (monitoring report, 2023-08-17). Claim safety is nonetheless weakened by inconsistent ER figures across documents and by the presence of a corrective action explicitly stating ER values were corrected, which increases perceived over-crediting risk (monitoring report, 2023-08-17). CCP status is not found in the extracted record, so buyers cannot rely on an additional quality screen here.

Documentation

The extracted record references multiple document types (PDD, validation report, monitoring report, issuance) and uses 29 documents with high extraction confidence, which is a positive foundation. However, the monitoring report lists numerous CARs and repeated missing-document issues (e.g., calibration certificates, complete JMRs/invoices, commissioning/PPA/O&M agreements, stakeholder documentation), indicating documentation completeness problems at the time of assessment (monitoring report, 2023-08-17). These gaps and revisions reduce confidence in the underlying evidence trail even if later provided.

Overall

Key contradictions materially affect reliability. For emissions reductions, conflicting claimed values appear across monitoring reports (422,632 in 2022-09-28 vs 839,190 in 2021-04-23), and verified values conflict across validation reports (472,857 in 2023-09-12 vs 422,632 in 2022-10-10); I privilege the more recent figures (422,632 claimed from the later monitoring report and 472,857 verified from the later validation report) because they are newer and likely reflect corrections, but the inconsistency itself lowers scores. Safeguards and grievance are contradictory (monitoring report 2023-08-17 says present; validation report 2022-11-04 says absent); I treat this as a documentation/control weakness and do not give full credit for safeguards. FPIC is also contradictory between validation reports (true in 2017-07-18 vs false in 2022-11-04); I privilege the more recent 'not conducted' statement, increasing safeguards risk.

Audit Analysis

This is a VCS grid-connected solar grouped project using ACM0002 with additionality confirmed by the VVB, but several MRV and reporting weaknesses reduce confidence. Leakage treatment is not evidenced in the extracted record, and multiple document contradictions (including ER figures and safeguards/grievance claims) raise reliability and over-crediting concerns.

Project Description

The grouped project activity aims to implement renewable energy projects in India by supporting the installation of grid-connected renewable energy power plants. The project ensures energy security, diversifies the grid generation mix, and promotes sustainable growth in the electricity generation sector. Through the sale of Verified Carbon Units, the project seeks to overcome technological, institutional, and financial barriers to enable investment in large and small grid-connected plants that export their generated output to the national electricity grid.

Red Flags

  • Conflicting emissions reduction figures across documents (claimed and verified), including a case where verified exceeds claimed, increasing over-crediting and data reliability risk.
  • Monitoring/verification raised numerous corrective actions and missing evidence items (e.g., commissioning/PPA/O&M documents, complete JMRs/invoices, calibration certificates), indicating MRV control weaknesses.

Credit Vintages

Issued Retired Available
2015
20,388 20,388 0
2016
401,854 401,854 0
2017
724,492 718,826 5,666
2018
666,086 666,086 0
2019
639,708 638,803 905
2020
660,368 660,368 0
2021
458,723 458,623 100
2023
6,300 6,300 0
Total 3,577,919 3,571,248 6,671

Cosa migliorerebbe questo punteggio

  • Publish a reconciled ER table (by vintage and monitoring period) that explains all corrections and aligns claimed vs verified totals across monitoring/validation/issuance documents.
  • Provide complete MRV evidence packages upfront (meter calibration certificates for the full period, complete JMRs/invoices, commissioning/PPA/O&M documents) and a consistent safeguards/FPIC and grievance narrative with supporting records.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Avoidance project; no reversal events evidenced

Leakage

Leakage not addressed / deduction not evidenced

Baseline

Project-specific baseline; reassessment timing unclear

Safeguards

Safeguards/FPIC inconsistent across documents

Double-claim

Not CORSIA-eligible; CCP status not found

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-02 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti