4.5/ 10
Integrity
4.0
Transparency
5.0
Claim Safety
5.0
Documentation
4.0

Audit Analysis

This 86 MW hydro project in Himachal Pradesh has a confirmed additionality assessment and a reasonable zero-leakage justification for a renewable energy source, but the verification report (March 2025) flags 12 material findings and over 40 corrective actions, including an incorrect grid emission factor in the ERR calculations and a calibration-frequency deviation from the monitoring plan. The sheer volume of unresolved quality issues significantly undermines confidence in the integrity and accuracy of the issued credits.

Red Flags

  • The 2025 verification report identifies an incorrect grid emission factor applied in ERR calculations, directly affecting the quantity of credits issued
  • Over 40 corrective actions are outstanding, including missing calibration certificates, inconsistent meter details, and unassessed CDM tools (TOOL07, TOOL11) and regulatory surplus
  • Calibration frequency deviated from the monitoring plan: six-month calibration was required but the site visit found calibration had not been performed for more than one year
  • Reversal events are marked as 'not addressed' in the verification report despite the project being a hydro facility with a 10-year crediting period

Credit Vintages

IssuedRetiredAvailable
2001
122,509122,5090
2002
191,865128,12115,000
2003
73,35873,3580
2004
97,03243,76213,270
2005
259,651229,6510
2006
228,9696,00060,852
2007
48,59746,5280
2008
266,865127,20664,846
2009
226,9605,8230
2010
335,084169,868177
2011
182,498182,4980
2012
286,716283,9032,813
2013
269,882269,779103
2014
277,711276,846865
2015
292,593279,47313,120
2017
166,408159,1507,258
2018
218,325210,9467,379
2020
14,34312,5351,808
2021
271,695243,64728,048
2022
236,2450236,245
Total4,067,3062,871,603451,784

Risk Indicators

Additionality

VVB-confirmed barrier test

Permanence

reversals not addressed

Leakage

0% deduction justified but labelled 'not addressed' in 2025 VR

Baseline

Project-specific; method contradicted across documents; no reassessment date

Safeguards

FPIC conducted; grievance mechanism present

Double-claim

CORSIA not eligible; CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-01ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents