Capricorn Ridge 4 is a well-documented wind energy avoidance project with VVB-confirmed additionality (combined test) and a reasonable grid-emission-factor baseline. The 2020–2021 monitoring period delivered approximately 94% of the pro-rata ex-ante expectation, indicating conservative crediting. Minor calculation errors and meter-calibration gaps were identified and corrected, but no material integrity concerns remain.
Red Flags
- Monitoring-period gaps exist between 2010 and 2014–2015 periods; the verification report required confirmation that no negative emission reductions arose from these gaps
- Baseline method is described as 'project' in the 2022 verification report but 'jurisdictional' in the 2022 monitoring report — an internal inconsistency that weakens baseline clarity
- CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2010 | 142,836 | 142,836 | 0 | |
| 2014 | 153,252 | 153,252 | 0 | |
| 2015 | 114,933 | 114,933 | 0 | |
| 2016 | 135,816 | 135,816 | 0 | |
| 2017 | 117,283 | 117,283 | 0 | |
| 2018 | 113,155 | 80,140 | 33,015 | |
| 2019 | 212,830 | 188,536 | 24,294 | |
| 2020 | 175,584 | 51,158 | 124,426 | |
| 2021 | 173,721 | 13,941 | 159,780 | |
| Total | 1,339,410 | 997,895 | 341,515 |
Risk Indicators
Combined test, VVB-confirmed
Physical wind asset, no reversal risk
0% with quantified justification
Project-specific; method inconsistency across docs
Grievance mechanism present; no FPIC
CORSIA and CCP status not stated
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →