Registry document
GS947 Validation Report 29.05.2012_v2
Published by Gold Standard for this project. CarbonMeld stores a copy as retrieved from the registry: the document is the registry's, not ours.
- Project
- Killik Wind Power Plant (GS-1269)
- Document type
- Validation Report
- Registry
- Gold Standard
- Retrieved from the registry
- File
- GS947 Validation Report 29.05.2012_v2.pdf
Open the PDFRegistry record of the project ↗
AnalysisRe-assessment pending
See CarbonMeld's analysis of this project →Cite this document
Gold Standard. GS947 Validation Report 29.05.2012_v2 (Validation Report), Killik Wind Power Plant (GS-1269). CarbonMeld copy, retrieved from the registry on 15 Apr 2026: https://carbonmeld.com/projects/docs/killik-wind-power-plant-4b99c4/b629c807e8499e1e/.
Please cite or link this page rather than the PDF file: it shows where the document comes from and links to the project's page.
