Killik Wind Power Plant
Score Breakdown
Integrity
verified Additionality was confirmed by the VVB, and the project uses ACM0002 with a project baseline and a baseline reassessment in 2020.
missing The verification material lists many corrective actions and clarification requests, and the record contains contradictions on the additionality test and leakage treatment.
Transparency
verified The monitoring period is stated for 2024, the verifier is named as Re Carbon Ltd., and verified emissions reductions are reported at 120,869.
missing Total claimed reductions are not found in the extracted record, the usage monitoring method is not stated, and the extraction confidence is low.
Claim Safety
verified The project is marked CORSIA-eligible, leakage is described as negligible with a 0% deduction, and no reversal events are reported.
missing CCP status is not mentioned, and the contradiction log shows leakage was previously not addressed and the crediting period differs across documents.
Documentation
verified Eighteen documents were used, and the file includes a verification report with corrective action closure before issuance.
missing The extraction confidence is low, the evidence-doc list is effectively generic, and several key fields are missing or not stated in available documents.
Detailed Analysis
Integrity
The project benefits from a VVB-confirmed additionality assessment, a project baseline under ACM0002, and a baseline reassessment in 2020, which are supportive signals. Integrity is weakened by the large number of corrective and clarification requests in the verification material and by contradictions on the additionality test type and leakage treatment, which reduce confidence in the robustness of the underlying assessment.
Transparency
Transparency is only moderate because the monitoring period, verifier name, and verified reductions are stated, but the record does not provide the total claimed reductions or a usage monitoring method. The low extraction confidence also suggests at least one key document was difficult to read, so the documentation trail is not fully reliable.
Claim Safety
Claim safety is helped by the project being marked CORSIA-eligible, the leakage deduction being 0% with a negligible justification, and no reported reversal events. That said, CCP status is not mentioned, and the contradiction log shows earlier documents treated leakage as not addressed and gave a different crediting period, which raises over-crediting and claims-risk concerns.
Documentation
The file draws on 18 documents and includes a verification report where corrective actions were closed before issuance, which is a positive sign. Still, the extraction confidence is low, the evidence list is not specific, and several important items are missing or only partially stated, so the documentation quality is limited.
Overall
I privileged the most recent and more specific statements where possible: the 2024 verification-era information for reversals and leakage, and the later combined additionality test over the older investment-test reference. The contradictions matter materially: additionality test type differs across documents, leakage moved from not addressed to negligible, reversals moved from not addressed to none reported, and the crediting period differs between sources; these issues lower reliability and keep the overall score in the mid range. Because documentation quality is weak and the record contains multiple unresolved discrepancies, the project should be treated cautiously even though the core wind-project attributes are generally favorable.
Audit Analysis
This is a wind project with VVB-confirmed additionality, no reported reversals, and a quantified leakage deduction of 0%, which supports moderate integrity. However, the record has low extraction confidence, several corrective actions and clarification requests, and contradictions on additionality testing, leakage treatment, reversals, and the crediting period, which reduce confidence in the documentation and claims.
Project Description
Developer: Eksim Enerji Anonim Sirketi Type: Wind Size: Large Scale Crediting period: 2011-10-13 → 2025-10-12 Estimated annual credits: 55523 tCO2e SDGs: Goal 13: Climate Action, Goal 7: Affordable and Clean Energy, Goal 8: Decent Work and Economic Growth
Red Flags
- Low extraction confidence and only a generic evidence-doc record make the file harder to verify independently.
- Multiple contradictions across documents on additionality, leakage, reversals, and the crediting period indicate reliability issues.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2011 | 8,305 | 8,305 | 0 | |
| 2012 | 61,756 | 61,643 | 113 | |
| 2013 | 66,295 | 66,295 | 0 | |
| 2016 | 17,048 | 17,048 | 0 | |
| 2017 | 58,334 | 57,008 | 1,326 | |
| 2018 | 45,485 | 45,485 | 0 | |
| 2021 | 15,501 | 0 | 15,501 | |
| 2022 | 55,956 | 0 | 55,956 | |
| 2023 | 14,426 | 0 | 14,426 | |
| Total | 343,106 | 255,784 | 87,322 |
Cosa migliorerebbe questo punteggio
- Provide a clean, reconciled document set that resolves the contradictions on additionality, leakage, reversals, and the crediting period.
- Publish the missing monitoring details, including the usage monitoring method and the total claimed versus verified reductions, with clearer source documents.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed but contradictory test history
No reversals reported
0% deduction with negligible justification
Project baseline with reassessment timing known
FPIC, grievance mechanism, and benefit sharing documented
CORSIA-eligible; CCP status not mentioned
Where to buy
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Registry Documents
monitoring
- Final_ER calculations_661 Killik wind_v03_12-01-2022.xlsx
- 853 Killik wind - GS - Ver to PDFinal_MR_853 Killik Wind _v05_13-03-2024.pdf
- Killik_WPP_Annual_Report.pdf
- Final_Ver Report_853 Killik Wind _Öykü Yakupoğlu_v03_03-04-2024_cln.pdf
- Monitoring Report_2nd monitoring period_28.08.2016 to 12.10.2018_v6.pdf
- 853 Killik wind - GS - Ver to PDFinal_ER calculations_853 Killik Wind _v04_21-06-2023.xlsx
- +4 more
pdd
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti