(1)Verification Report_1st monitoring period_15.11.2011 to 31.10.2013_v1.1Aa

Published by Gold Standard for this project. CarbonMeld stores a copy as retrieved from the registry: the document is the registry's, not ours.

Project
Sah Wind Power Plant (GS-1251)
Document type
Verification Report
Registry
Gold Standard
Retrieved from the registry
File
(1)Verification Report_1st monitoring period_15.11.2011 to 31.10.2013_v1.1Aa.pdf

Open the PDFRegistry record of the project ↗

AnalysisRe-assessment pending

See CarbonMeld's analysis of this project →

Cite this document

Gold Standard. (1)Verification Report_1st monitoring period_15.11.2011 to 31.10.2013_v1.1Aa (Verification Report), Sah Wind Power Plant (GS-1251). CarbonMeld copy, retrieved from the registry on 15 Apr 2026: https://carbonmeld.com/projects/docs/sah-wind-power-plant-60922e/f7241d8476d000c0/.