Sah Wind Power Plant
GS-1251 ↗ · current registry ID: GS905
#232of 1935 in Renewable energy#49of 295 in Turkey#85of 1801 in Gold Standard (GS)#170of 1287 in ACM0002
Audit Analysis
The Sah Wind Power Plant is a Gold Standard wind project in Turkey with a solid additionality case (investment test, VVB-verified) and a reasonable pro-rata delivery of approximately 82% of the expected emission reductions for the elapsed monitoring period. However, the project carries a notable number of inter-document contradictions (10 identified), multiple open corrective actions, and a 0% leakage deduction whose justification is inconsistent across verification reports, which collectively moderate confidence in the data record.
Red Flags
- Ten inter-document contradictions identified, including FPIC status (conducted per 2021 verification report vs. not conducted per 2023 PDD), baseline method (project-specific per 2026 VR vs. jurisdictional per 2020 monitoring report), and leakage justification (quantified per 2026 VR vs. deemed negligible per 2024 VR)
- Multiple corrective actions and compliance-level findings remain open or require monitoring in the next verification period (CAR 1–4, CL 01, FAR 01 referenced in the 2026 verification report)
- Leakage deduction of 0% with contradictory justifications across two verification reports; no buffer pool percentage stated in the extracted record
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2011 | 21,960 | 21,937 | 23 | |
| 2012 | 167,756 | 67,529 | 100,227 | |
| 2013 | 145,878 | 145,877 | 1 | |
| 2015 | 115,743 | 115,743 | 0 | |
| 2016 | 197,438 | 158,213 | 39,225 | |
| 2017 | 178,378 | 122,664 | 55,714 | |
| 2018 | 190,234 | 135,747 | 54,487 | |
| 2019 | 182,821 | 149,495 | 33,326 | |
| 2020 | 192,611 | 192,611 | 0 | |
| 2021 | 180,058 | 40,233 | 139,825 | |
| 2022 | 186,300 | 2,689 | 183,611 | |
| 2023 | 177,356 | 0 | 177,356 | |
| 2024 | 43,693 | 0 | 43,693 | |
| Total | 1,980,226 | 1,152,738 | 827,488 |
Risk Indicators
Investment test, VVB-verified
Low inherent risk (wind), but not explicitly addressed in latest VR
0% deduction with contradictory justification across reports
Combined Margin method, reassessed 2025, but project-specific vs. jurisdictional inconsistency
FPIC and grievance mechanism reported, but FPIC status contradicted in PDD
CORSIA and CCP status not stated; dual-channel risk unassessed
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →