Vai al contenuto principale
ACR IFM (Improve Forest Management) United States Vintage 2021 Documentazione completa General Methodology v2.0

Doyon Native Community Forest Project

ACR-592 ↗

6.5 / 10
Integrity
6.8
Transparency
6.2
Claim Safety
6.0
Documentation
7.4

Score Breakdown

Integrity

verified Additionality is confirmed by the VVB (validation report), and no material findings or corrective actions were reported (monitoring report, 2022-09-23).

missing Baseline method and baseline reassessment timing were not found in the extracted record, increasing uncertainty around baseline validity.

Transparency

verified Independent VVB is identified as SCS Global Services, and a specific monitoring period is disclosed (monitoring report, 2022-09-23).

missing Total ERR claimed and total ERR verified were not found in the extracted record, limiting MRV cross-checking.

Claim Safety

verified The project is explicitly not CORSIA-eligible, reducing aviation-claim channel risk (extracted record).

missing Baseline details were not found in the extracted record, and CCP status is not stated, leaving residual over-crediting and label-claim uncertainty.

Documentation

verified Three core documents are present (PDD, validation report, monitoring report) with high extraction confidence.

missing Safeguards reporting differs between the PDD (2022-09-15) and monitoring report (2022-09-23), indicating internal documentation inconsistency.

Detailed Analysis

Integrity

The validation documentation indicates additionality was confirmed by the VVB, which supports additionality robustness. Permanence risk management appears reasonably strong for an IFM project due to a 22% buffer pool contribution (extracted record), and no reversals were reported in the extracted record. Leakage treatment is comparatively conservative: the monitoring documentation indicates leakage was quantified with a 40% leakage deduction (monitoring report, 2022-09-23). The main integrity gap is that the baseline method and any baseline reassessment timing were not found in the extracted record, which is central to IFM credit quantification.

Transparency

The monitoring report clearly states the monitoring period (2020-08-19 to 2021-08-18) and identifies the verifier as SCS Global Services (monitoring report, 2022-09-23). The extracted record also shows no material findings and no corrective actions required, which is helpful for assessing audit outcomes (monitoring report, 2022-09-23). However, total ERR claimed and total ERR verified were not found in the extracted record, preventing a basic reconciliation of quantified outcomes. Several operational MRV details (for example, usage monitoring) are not applicable or not found, which limits transparency beyond core forest carbon accounting.

Claim Safety

The project is explicitly not CORSIA-eligible, which lowers the risk of high-profile aviation-related claims (extracted record). Leakage appears to be treated conservatively via a large quantified deduction of 40% (monitoring report, 2022-09-23), which can reduce over-crediting risk if appropriately justified. Nonetheless, baseline method details were not found in the extracted record, which is a primary driver of over-crediting risk in IFM. CCP status is not stated in the extracted record, so buyers should avoid making CCP-aligned claims without further confirmation.

Documentation

The extracted record includes a PDD, validation report, and monitoring report (three documents total) with high extraction confidence, supporting a solid documentation score. The monitoring report is recent (2022-09-23) and includes the monitoring period and audit outcomes (monitoring report, 2022-09-23). However, some key quantification fields (ERR totals, baseline method, crediting period) were not found in the extracted record, indicating incompleteness for buyer due diligence. In addition, safeguards reporting is inconsistent between documents, which reduces confidence in narrative disclosures.

Overall

Overall quality is moderate: additionality is VVB-confirmed and permanence/leakage controls look directionally conservative (22% buffer; 40% leakage deduction), but missing baseline and ERR totals constrain confidence in the credit quantification. The key contradiction is safeguards disclosure: the monitoring report (2022-09-23) indicates safeguards are mentioned, while the PDD (2022-09-15) indicates they are not. For scoring, the monitoring report was privileged as the later, implementation-stage document, but the inconsistency itself reduces transparency/documentation scores because it signals unreliable or shifting disclosures. No gate-rule caps are triggered because documentation and integrity remain above the stated thresholds.

Audit Analysis

This ACR IFM project shows several integrity-positive features, including VVB-confirmed additionality, a substantial 22% buffer contribution, and a large quantified leakage deduction of 40%. However, key baseline and crediting details were not found in the extracted record, and safeguards reporting is inconsistent between the PDD and the monitoring report, which increases uncertainty for buyers.

Project Description

Doyon Limited is an Alaska Native corporation founded on Native Values and Vision. The revenues from these offsets are going to support the local Native community's basic needs such student scholarships and runways for remote communities. The project is sustainably managing and preserving up to 200,000 acres of forested lands.

Red Flags

  • Baseline approach and timing of baseline reassessment were not found in the extracted record, limiting confidence in over-crediting risk controls.
  • Safeguards disclosure is inconsistent: the monitoring report mentions safeguards, while the PDD indicates they are not mentioned.
  • No verified or claimed ERR totals were found in the extracted record, reducing the ability to cross-check issuance claims.

Credit Vintages

Issued Retired Available
2020
136,882 0 136,882
2021
298,404 0 298,404
2022
243,938 0 243,938
2023
226,355 0 226,355
Total 905,579 0 905,579

Cosa migliorerebbe questo punteggio

  • Disclose and/or extract the baseline approach used and the date/results of the most recent baseline reassessment, with clear references to the governing ACR IFM methodology sections.
  • Provide the monitoring/verification tables showing total ERR claimed and total ERR verified for the stated monitoring period, enabling reconciliation against registry issuance/retirement records.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed additionality

Permanence

Buffer pool contribution; no reversals found

Leakage

Quantified leakage with 40% deduction

Baseline

Baseline method not found in extracted record

Safeguards

Safeguards inconsistently documented; no FPIC/grievance

Double-claim

Not CORSIA-eligible; CCP status not stated

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
ACR-592 ↗

Registry Documents

monitoring

pdd

Analysis Provenance Scored 2026-04-02 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti