DSK Composting Project
#954of 1329 in Industrial#12of 19 in Philippines#1197of 1459 in CDM (UNFCCC)#5of 6 in AM0025
Audit Analysis
The DSK Composting Project is a CDM methane-avoidance project in the Philippines with VVB-confirmed additionality, but the validation report raised 20 corrective action requests covering baseline calculations, leakage justification, and monitoring plan gaps. A direct contradiction exists between the validation report's 'negligible' leakage claim and an appendix describing quantified leakage, and the project-specific modeled baseline adds uncertainty. Overall, the project is functional but carries moderate quality and data-reliability concerns.
Red Flags
- 20 corrective action requests raised during validation, including incorrect emission-reduction formulae, unjustified parameter values (Kj, NCV, EFfuel, AF, CEFelec), and an incomplete monitoring plan
- Contradiction on leakage: validation report states 'deemed negligible' while an appendix describes it as 'quantified'; CAR 19 specifically flags that transportation leakage justification was incorrect
- Grid emission factor of 0.4503 tCO2/MWh is from 2009 and no updated value is documented
- Low extraction confidence across the document set, limiting assurance that all key parameters were correctly captured
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test
mixed evidence / unresolved risk
0% deduction, contradictory justification
Project-specific modeled, no reassessment date
Mentioned, benefit sharing described, FPIC/grievance not sta
CCP and CORSIA status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →