Eco Energy Beer Tuvya - Animal manure anaerobic treatment facility
#7of 8 in Israel#1356of 1459 in CDM (UNFCCC)#17of 20 in AM0073
Audit Analysis
A CDM methane-avoidance project in Israel with a VVB-confirmed barrier additionality test, but significant data gaps and a severe unexplained discrepancy in claimed emission reductions (a 7-fold difference between the PDD and an unidentified source document). The project-specific modeled baseline, 0% leakage deduction with a contradictory justification, and the absence of any monitoring-period data or verified ERR figures limit confidence in the credit claims.
Red Flags
- Massive ERR contradiction: the PDD (Dec 2021) claims 246,723 tCO₂e while an unidentified document reports 1,727,059 tCO₂e — a 7× discrepancy that cannot be reconciled from available records
- Five material findings in the validation report, including outdated animal-production data, missing methodology applicability justification, and a grid emission factor not based on the latest Israel Electricity Authority data
- No monitoring-period data, verified ERR, FNRB method, or usage-monitoring method found in any available document
- Leakage justification contradicts itself across documents: the PDD states 'deemed negligible' while an unidentified source states 'quantified'
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed barrier test
low reversal risk for methane avoidan
0% deduction, 'deemed negligible' but contradicted by anothe
Project-specific modeled baseline, reassessed 2021
Safeguards and benefit-sharing mentioned; no FPIC or grievan
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →