Energy efficiency measures at Mindspace Airoli Building No 3, 8 and 14 of Serene Properties Pvt Ltd at Navi Mumbai
#669of 1329 in Industrial#650of 975 in India#959of 1459 in CDM (UNFCCC)#9of 15 in AMS-II.E
Audit Analysis
A CDM building energy-efficiency project (AMS II.E) with VVB-confirmed additionality via an investment test, but hampered by seven material findings at validation (including a calculation error in the weighted-average emission factor), a project-specific modeled baseline with no stated reassessment date, and a thin 0% leakage justification. Low extraction confidence and the absence of monitoring-period data limit the ability to verify ongoing performance.
Red Flags
- Seven material findings at validation, including exclusion of DG generation from the weighted-average emission factor calculation for two buildings (CAR#08), which directly affects credit quantity
- Contradiction in total ERR between the PDD (13,374) and the validation report (133,740) — a tenfold discrepancy that, while likely a typographical error, undermines data reliability
- Baseline method contradiction: the PDD describes a jurisdictional baseline while the validation report records a project-specific baseline
- No buffer pool percentage stated and no explicit permanence or reversal-risk analysis for an energy-efficiency project
- Minimum extraction confidence rated low, indicating at least one key document was poorly readable
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test
mixed evidence / unresolved risk
0% deemed negligible, thin justification
Project-specific, modeled, no reassessment date
Mentioned but FPIC and grievance mechanism not detailed
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →