Energy Efficiency Measures at MindSpace Building No 9 at Hyderabad

CDM-10009 ↗

#41of 1329 in Industrial#156of 975 in India#192of 1459 in CDM (UNFCCC)#1of 15 in AMS-II.E

6.1/ 10
Integrity
6.5
Transparency
5.5
Claim Safety
5.5
Documentation
7.0

Audit Analysis

A CDM energy-efficiency project at a commercial building in Hyderabad with a VVB-confirmed investment additionality test and a reasonable 0% leakage deduction. However, contradictions between the validation and monitoring reports on the baseline method and ERR figures, combined with missing FN/RB and usage-monitoring details, limit confidence in the credit quantity. The project is mid-crediting-period with no open corrective actions.

Red Flags

  • ERR figures conflict between the validation report (142,330 tCO₂e) and the monitoring report (63,719 tCO₂e); the basis of each figure (full crediting period vs. single monitoring period) is not clearly reconciled in the extracted record.
  • Baseline method is stated as 'project' in the 2022 monitoring report but 'jurisdictional' in the 2014 validation report, creating uncertainty about which baseline was actually applied.
  • FN/RB method and value, and the usage-monitoring method, are not stated in any available document, leaving a gap in the MRV chain.
  • Grid emission factor of 0.8652 tCO₂/MWh is anchored to 2011 and no update mechanism is documented.

Credit Vintages

IssuedRetiredAvailable
2023
59,343059,343
Total59,343059,343

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

EE project has lower

Leakage

0% deduction, deemed negligible, consistent with building EE

Baseline

Project-specific baseline; method contradicts across documen

Safeguards

Safeguards and benefit sharing mentioned; FPIC and grievance

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-29AMS II.E1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents