Evra Biomass Power Plant Project
#231of 352 in Biomass#43of 75 in TR#85of 154 in Intl. Carbon Registry (ICR)#134of 159 in ACM0001
Audit Analysis
The Evra Biomass Power Plant is an ICR-registered avoidance project in Turkey that replaces grid electricity with biomass-generated power. While additionality was confirmed by the VVB via a combined test and the verified ERR matches the claimed figure, the project carries significant integrity concerns: 20 material findings (including insufficient additionality evidence for multiple levels, a grid emission factor inconsistency, and a gas flare installed after the project start date), a project-specific modeled baseline with no stated reassessment date, no buffer pool, and contradictory leakage justifications across documents. The low extraction confidence and numerous administrative gaps further weaken the evidentiary base.
Red Flags
- Additionality section found to lack sufficient evidence and justification for Levels 2a, 2b, and 3 (validation report material finding)
- Inconsistent grid emission factor values between the PDD and the ER sheet (validation report material finding)
- Gas flare manufacturing date (2021) post-dates the project start date (2020), raising questions about the project boundary and baseline (validation report material finding)
- Leakage justification is contradictory: the validation report states it was 'quantified' while the PDD states it was 'deemed negligible', yet the deduction is 0% in both
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2020 | 7,734 | 0 | 7,734 | |
| 2021 | 72,196 | 0 | 72,196 | |
| 2022 | 63,324 | 0 | 63,324 | |
| 2023 | 55,831 | 0 | 55,831 | |
| 2024 | 52,991 | 0 | 52,991 | |
| 2025 | 48,284 | 0 | 48,284 | |
| 2026 | 44,267 | 0 | 44,267 | |
| 2027 | 41,062 | 0 | 41,062 | |
| 2028 | 38,537 | 0 | 38,537 | |
| 2029 | 36,583 | 0 | 36,583 | |
| 2030 | 31,786 | 0 | 31,786 | |
| Total | 492,595 | 0 | 492,595 |
Risk Indicators
VVB-confirmed but evidence gaps at Levels 2a/2b/3
mixed evidence / unresolved risk
0% deduction, justification inconsistent across documents
Project-specific, modeled, no reassessment date stated
FPIC and grievance mechanism present, but documentation gaps
CORSIA and CCP status both not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.