FEDEPALMA SECTORAL CDM UMBRELLA PROJECT FOR METHANE CAPTURE, FOSSIL FUEL DISPLACEMENT AND COGENERATION OF RENEWABLE ENERGY
#1543of 1935 in Renewable energy#110of 124 in Colombia#1330of 1459 in CDM (UNFCCC)
Audit Analysis
This CDM umbrella project for methane capture at Colombian palm-oil mills delivered only about 9% of its ex-ante emission-reduction estimate over the full crediting period, with just 5 of 32 registered plants active during the last monitoring window. A critical contradiction between the PDD (15% quantified leakage) and the monitoring report (0%, deemed negligible) undermines confidence in the leakage treatment, and eight material findings plus four corrective actions signal persistent data-quality and compliance gaps. The project is not over-crediting, but the baseline appears overly optimistic and the documentation record is internally inconsistent.
Red Flags
- Leakage deduction dropped from 15% (quantified in the PDD, 2009) to 0% (deemed negligible in the monitoring report, 2020) with no documented re-justification
- Only 5 of 32 registered extraction plants implemented project activities during the monitoring period, yet credits were issued against the full 32-plant baseline
- Cumulative emission reductions (453,651 tCO2e) represent only ~9% of the ex-ante estimate (5,299,466 tCO2e), suggesting the baseline was substantially over-estimated
- Internal contradiction within the same monitoring report on whether methane capture is legally required (stated as both true and false)
- Flare efficiency was 50% (open flaring) versus the 90% assumed in the PDD, inflating project emissions and reducing net reductions
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed but test type contradicted
Methane capture – no inherent reversal risk
PDD 15% vs monitoring 0% – unexplained shift
Project-specific, mixed, 9% delivery
Mentioned but FPIC and grievance not documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →