Audit Analysis
This CDM landfill gas project in Morocco has a VVB-confirmed investment additionality test and a reasonable leakage treatment, but is undermined by a 78% discrepancy in the grid emission factor across documents, a missing buffer pool, a project-specific modeled baseline, and 21 unresolved CARs/CLs during verification. The verified ERR figure is absent from the extracted record, and the crediting period differs between the PDD and the monitoring report, raising data-reliability concerns that temper confidence in the credit claims.
Red Flags
- Grid emission factor differs by 78% between the PDD (0.4 tCO₂e/MWh, 2020) and the appendix (0.7138 tCO₂e/MWh, 2014), directly affecting the electricity-generation credit calculation
- Crediting period is 2015-03-12 to 2025-03-11 in the monitoring report but 2013-10-01 to 2023-09-30 in the PDD — a two-year shift in both start and end dates
- 11 Corrective Action Requests and 10 Clarification Requests were raised during verification, including a reduction of installed capacity from 3 MW to 1 MW due to low biogas availability
- Total verified ERR is not stated in the extracted record, preventing independent confirmation of actual credit delivery
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 11,869 | 0 | 11,869 | |
| Total | 11,869 | 0 | 11,869 |
Risk Indicators
VVB-confirmed investment test
reversal risk unaddressed
Deemed negligible; reasonable for LFG
Project-specific modeled baseline; no reassessment date
Safeguards mentioned; benefit sharing described; FPIC and gr
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →