The Foca Biogas project is a VCS-registered anaerobic digestion facility in Turkey with a verified investment-test additionality assessment and no permanence risk (non-AFOLU). The project delivered approximately 62% of its pro-rata ex-ante expectation for the two-year monitoring period, indicating conservative crediting. However, the project-specific modeled baseline, a 0% leakage deduction, and 17 closed corrective action requests introduce moderate uncertainty.
Red Flags
- 17 Corrective Action Requests were raised during verification (all closed), indicating significant initial data or methodology issues that required remediation
- Methodology deviation was approved to reduce Wmanure,LT monitoring frequency from daily to annual, which weakens the MRV granularity relative to the AM0073-1.0 requirements
- Leakage justification is inconsistent between the PDD (deemed negligible) and the verification report (quantified), though both result in a 0% deduction
- Grid emission factor is from 2018 and no updated factor or reassessment is documented for the 2023 verification
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2019 | 30,184 | 0 | 30,184 | |
| 2020 | 184,129 | 0 | 184,129 | |
| 2021 | 197,823 | 0 | 197,823 | |
| Total | 412,136 | 0 | 412,136 |
Risk Indicators
VVB-verified investment test
Non-AFOLU, no reversal risk
0% deduction, justification inconsistent across docs
Project-specific modeled baseline, not yet due for reassessment
FPIC conducted, grievance mechanism present
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →