Frio Industrias Argentinas S.A (FIASA) Hydro-fluorocarbon 23 (HFC23) Capture, Storage and Decomposition Project
#6of 18 in Argentina#541of 1459 in CDM (UNFCCC)
Audit Analysis
The FIASA HFC-23 destruction project in Argentina is a well-structured CDM project with VVB-confirmed additionality and a measured project-specific baseline, but it is undermined by extensive calibration and data-consistency issues across multiple monitoring periods, a large number of corrective actions, and several unresolved contradictions between the PDD and monitoring reports. The absence of a verified ERR figure, buffer pool, and CORSIA/CCP status limits confidence in the credit claims.
Red Flags
- 30+ material findings across monitoring periods, including repeated scale and gas-meter calibration lapses where maximal error was applied, indicating systemic MRV weaknesses
- 14 corrective actions required, including inconsistencies between the PDD and actual practice (lime used instead of caustic soda, data-collection frequency not described, leakage figures not matching between PDD and spreadsheet)
- Total ERR verified figure is not available in the extracted record, preventing independent verification of issued credits against the 455,383 tCO2e lifetime claim
- No buffer pool or permanence mechanism is stated in the available documents, leaving reversal risk unaddressed despite the project being a destruction (avoidance) type
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2009 | 1,480,558 | 0 | 1,480,558 | |
| 2010 | 775,816 | 0 | 775,816 | |
| 2011 | 1,824,950 | 0 | 1,824,950 | |
| 2012 | 677,218 | 0 | 677,218 | |
| 2013 | 2,092,448 | 0 | 2,092,448 | |
| 2014 | 455,559 | 0 | 455,559 | |
| Total | 7,306,549 | 0 | 7,306,549 |
Risk Indicators
VVB-confirmed barrier test; capture not legally required
mixed evidence / unresolved risk
Quantified per monitoring reports but no specific deduction
Project-specific measured baseline; last reassessed 2005
Safeguards mentioned and benefit sharing described; FPIC and
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →