Fuel Switching from Mazout to Natural Gas in Misr Fine Spinning & Weaving and Misr Beida Dyers at Kafr El Dawar

CDM-4224 ↗

#352of 1329 in Industrial#6of 9 in Egypt#680of 1459 in CDM (UNFCCC)

5.2/ 10
Integrity
5.5
Transparency
4.5
Claim Safety
5.0
Documentation
6.0

Audit Analysis

A straightforward CDM fuel-switching project (mazout to natural gas) at two Egyptian textile facilities, validated by Germanischer Lloyd with a barrier-test additionality assessment. The project is methodologically sound (AMS-III.B) but suffers from a weak leakage justification, a project-specific baseline, an unresolved discrepancy between two monitoring reports on total emissions reductions, and 19 material findings at validation (all subsequently resolved). Overall a moderate-quality credit with notable data-reliability concerns.

Red Flags

  • Two monitoring reports report different total ERR figures (4,976 vs 5,730 tCO2e) for overlapping periods, indicating a data-reliability issue in the MRV record.
  • Leakage deduction is 0% and the monitoring report does not address leakage at all; only the validation report states it was 'deemed negligible' without quantified justification.
  • 19 material findings were raised at validation (including incorrect boiler lifetimes, overestimated steam flow data, and missing monitoring-plan details), suggesting the initial PDD and monitoring plan were of below-average quality.
  • Baseline is project-specific rather than jurisdictional, and no baseline reassessment date is recorded in the available documents.

Credit Vintages

IssuedRetiredAvailable
2012
5,73005,730
2013
4,97704,977
Total10,707010,707

Risk Indicators

Additionality

VVB-confirmed barrier test

Permanence

Fuel switch – no reversal risk

Leakage

0% deduction, weak justification

Baseline

Project-specific, no reassessment date

Safeguards

Mentioned but details not extracted

Double-claim

CCP/CORSIA status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-29AMS-III.B

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents