Fuel Switching from Mazout to Natural Gas in Misr Fine Spinning & Weaving and Misr Beida Dyers at Kafr El Dawar
#352of 1329 in Industrial#6of 9 in Egypt#680of 1459 in CDM (UNFCCC)
Audit Analysis
A straightforward CDM fuel-switching project (mazout to natural gas) at two Egyptian textile facilities, validated by Germanischer Lloyd with a barrier-test additionality assessment. The project is methodologically sound (AMS-III.B) but suffers from a weak leakage justification, a project-specific baseline, an unresolved discrepancy between two monitoring reports on total emissions reductions, and 19 material findings at validation (all subsequently resolved). Overall a moderate-quality credit with notable data-reliability concerns.
Red Flags
- Two monitoring reports report different total ERR figures (4,976 vs 5,730 tCO2e) for overlapping periods, indicating a data-reliability issue in the MRV record.
- Leakage deduction is 0% and the monitoring report does not address leakage at all; only the validation report states it was 'deemed negligible' without quantified justification.
- 19 material findings were raised at validation (including incorrect boiler lifetimes, overestimated steam flow data, and missing monitoring-plan details), suggesting the initial PDD and monitoring plan were of below-average quality.
- Baseline is project-specific rather than jurisdictional, and no baseline reassessment date is recorded in the available documents.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 5,730 | 0 | 5,730 | |
| 2013 | 4,977 | 0 | 4,977 | |
| Total | 10,707 | 0 | 10,707 |
Risk Indicators
VVB-confirmed barrier test
Fuel switch – no reversal risk
0% deduction, weak justification
Project-specific, no reassessment date
Mentioned but details not extracted
CCP/CORSIA status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →