Score Breakdown
Integrity
verified Additionality was confirmed by the VVB (verification report by Applus+).
missing Leakage justification not addressed in the latest available document and baseline reassessment timing not stated — raises leakage and baseline validity concerns.
Transparency
verified Project uses Gold Standard registry and lists a monitoring period (2021-01-01 — 2023-10-30).
missing Core MRV outputs (total emission reductions claimed/verified, FN/RB method/value, usage monitoring) are not stated in available documents.
Claim Safety
verified Uses an established methodology (AMS.I.D, version 3.0) and reports a grid emission factor value (0.948).
missing Evidence of ER rounding not conservative and many missing monitoring records increase over-crediting risk.
Documentation
verified Fifteen documents were used and VVB name and verification actions are recorded (Applus+).
missing Many corrective actions remain or were raised during verification; evidence documents are listed as 'unknown' and extraction confidence is only medium.
Detailed Analysis
Integrity
Additionality was tested via an investment test and confirmed by the VVB (verification report by Applus+), which supports basic additionality. However, the project uses a project-specific baseline (AMS.I.D) with no documented recent reassessment of the baseline and leakage justification is not clearly addressed in the latest extracted records. Multiple material findings and numerous corrective actions (missing commissioning certificate, missing calibration certificates, incomplete generation records) indicate weaknesses in monitoring and increase the risk that reported ERs are not robust.
Transparency
The project is registered on Gold Standard and a monitoring period (2021-01-01 — 2023-10-30) is provided. The VVB is named (Applus+). Nonetheless, critical public-facing data are missing from the extracted record: total emission reductions claimed and verified are not stated, FN/RB method and value are absent, and evidence documents are labelled 'unknown'. Extraction confidence is medium, which further reduces transparency.
Claim Safety
There is a material over-crediting risk: the MR notes that ER values were not rounded down conservatively and several monitoring records needed for cross-checks are missing. Although a grid emission factor (0.948) is provided and an established methodology is used, missing usage monitoring and FN/RB details and unresolved corrective actions weaken confidence in claimed reductions and increase greenwashing risk.
Documentation
Fifteen documents were used and the verification is recent in the extracted record (doc_date 2024-11-12), but the evidence_docs are not identified and extraction confidence is medium. Numerous corrective actions were raised in verification (many relating to missing core documents and monitoring records). These gaps reduce the documentation score and suggest shortcomings in record quality and completeness.
Overall
I privileged values from the most recent available extraction (doc_date 2024-11-12) when resolving contradictions because newer verification/monitoring information typically reflects the current project state. Specifically: for leakage justification I privileged 'not addressed' as shown in the latest record rather than earlier 'deemed negligible' because absence of justification was present in the 2024 extraction; for reversal events I privileged 'none reported' from the 2024 record over earlier 'not addressed'; for crediting period I privileged '2016-02-13 — 2023-10-30' as recorded in the current dataset. These contradictions and the many corrective actions lower confidence in data reliability and warranted downward adjustments to scores. Overall weighted score (4.5) reflects moderate verification of additionality but notable weaknesses in MRV completeness, leakage treatment, and documentation. If documentation were to fall below the gate threshold, transparency would be capped post-hoc.
Audit Analysis
The project has some strengths (Gold Standard registration, VVB verification of additionality by Applus+), but suffers from multiple documentation gaps, unresolved monitoring/record-keeping issues and contradictory statements on leakage and reversal treatment. These issues reduce confidence in emission reduction reliability and increase risk of over-crediting.
Project Description
Developer: EKI Energy Services Limited Type: Solar Thermal - Electricity Size: Large Scale Methodology: AMS-I.D. Grid connected renewable electricity generation Crediting period: 2013-10-31 → 2023-10-30 Estimated annual credits: 7889 tCO2e SDGs: Goal 8: Decent Work and Economic Growth, Goal 13: Climate Action, Goal 7: Affordable and Clean Energy
Red Flags
- Leakage justification is inconsistently reported (documents state both 'deemed negligible' and 'not addressed').
- Multiple corrective actions and missing core monitoring evidence (commission certificate, technical manual, generation logs, calibration certificates).
- Key MRV figures (total ER claimed/verified) and grid EF provenance not provided in extracted records.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2016 | 6,995 | 0 | 6,995 | |
| 2017 | 7,664 | 0 | 7,664 | |
| 2018 | 8,331 | 0 | 8,331 | |
| 2019 | 8,041 | 0 | 8,041 | |
| 2020 | 590 | 0 | 590 | |
| Total | 31,621 | 0 | 31,621 |
Cosa migliorerebbe questo punteggio
- Provide and publish missing MRV evidence: total ER claimed/verified, calibration certificates, commissioning certificate, full generation logs and joint meter readings.
- Clarify and document leakage justification and baseline reassessment timing; resolve contradictions by issuing a clear, dated statement in monitoring/verification reports.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed investment test
no buffer info; reversals none reported
inconsistent/no justification
project baseline, reassessment missing
safeguards mentioned; FPIC unclear
CORSIA/CCP status not stated
Where to buy
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Registry Documents
monitoring
validation
- Verification Report_monitoring period_01-09-2017 to 01-02-2020.pdf
- FVR-0420- Clean- final.pdf
- Validation Report 22.09.2017.pdf
- Verification Report_1st monitoring period_13.02.2016 to 31.08.2017_v2.2.pdf
- Verification Report_2nd monitoring period_01-09-2017 to 01-02-2020_v2.pdf
- Verification Report_1st monitoring period_31.10.2013 to 31.08.2017_v1.pdf
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →