Grid connection of an isolated electricity system on the Pacific Coast of Colombia (Cauca Nariño)
#105of 124 in Colombia#1241of 1459 in CDM (UNFCCC)
Audit Analysis
A CDM grid-connection project in Colombia with VVB-confirmed additionality and quantified leakage, but undermined by two significant data contradictions (grid emission factor and total ERR), the absence of any verified ERR figure, and a low extraction confidence rating that limits trust in the extracted record. The 48 closed corrective action requests and an open SF6 monitoring concern further temper confidence in implementation quality.
Red Flags
- Grid emission factor appears as 0.1031 tCO₂/kWh in the validation report but 0.5913 tCO₂/kWh in an appendix — a 5.7× discrepancy that, if unresolved, directly affects the magnitude of claimed reductions
- Total ERR is 297,183 tCO₂ in the validation report versus 42,455 tCO₂ in the PDD — a 7× gap that may reflect an annual-vs-lifetime basis difference (42,455 × 7 ≈ 297,183) but is not explicitly reconciled in the available documents
- No verified ERR figure was found in any of the six extracted documents, leaving the claimed reductions unvalidated against actual monitoring results
- 48 Corrective Action Requests were raised during validation (all closed), indicating substantial implementation or documentation deficiencies at the time of validation
- A Forward Action Request regarding SF6 emissions monitoring remained open, with a corrective action to verify the monitoring plan during first verification
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test
mixed evidence / unresolved risk
Quantified at 0.07% with justification
Project-specific; grid EF contradiction unresolved
FPIC, safeguards, benefit-sharing documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →