GS10959 VPA04 Safe Water Project in Rwanda IV
GS-3090 ↗ · current registry ID: GS11135
#170of 1329 in Industrial#14of 139 in Rwanda#312of 1801 in Gold Standard (GS)
Audit Analysis
A Gold Standard water-purification project displacing thermal energy in Rwanda with verified additionality and no reversal events, but hampered by a project-specific baseline, an unresolved double-claiming corrective action, multiple material findings, and a crediting-period discrepancy between the validation and verification reports. The project is functional and monitored, yet the accumulation of clarifications and corrective actions signals moderate data-reliability concerns.
Red Flags
- Corrective action requires the project developer to clarify whether access to alternative water-purification technology is covered under another project and how double claiming is avoided — unresolved at time of verification.
- Crediting period stated as 2021-2026 (5 years) in the 2024 verification report but 2022-2037 (15 years) in the 2022 validation report; the shorter period is privileged as more recent and authoritative.
- Additionality test type is not specified in the extracted record despite VVB confirmation, limiting the ability to assess the robustness of the additionality argument.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2022 | 48,778 | 22,813 | 25,965 | |
| 2023 | 59,176 | 7,096 | 52,080 | |
| 2024 | 33,357 | 0 | 33,357 | |
| Total | 141,311 | 29,909 | 111,402 |
Risk Indicators
VVB-confirmed but test type unspecified
mixed evidence / unresolved risk
0% deduction, deemed negligible for water purification
Project-specific, no reassessment date found
FPIC, grievance mechanism, benefit sharing documented
Unresolved corrective action on alternative-technology overlap; CORSIA/CCP not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →