GS11638 GS11639 RVPA-1 SPOUTS Water Purifier Programme in Africa- WPS in Rwanda-VPA 6
GS-4207 ↗ · current registry ID: GS12308
#869of 1329 in Industrial#70of 139 in Rwanda#1285of 1801 in Gold Standard (GS)
Audit Analysis
The SPOUTS water purifier project in Rwanda has a VVB-verified combined additionality test and a quantified 5% leakage deduction, but is undermined by a project-specific baseline, absence of any buffer pool or permanence mechanism, and a critical contradiction in the fNRB value (88.72 in the 2026 verification report versus 0.9682 in the 2023 validation report) that raises serious over-crediting concerns. Multiple material findings, a water-quality testing deviation, and a long list of corrective actions further erode confidence in the integrity and reliability of the claimed emission reductions.
Red Flags
- fNRB value contradicts between documents: 88.72 (2026 verification report) vs 0.9682 (2023 validation report) — a ~92× discrepancy that, if unresolved, could indicate massive over-crediting
- No buffer pool or permanence mechanism is stated in any available document for an avoidance-type project where filter breakage (212 beneficiaries affected) is a documented reversal risk
- Water quality testing covered only E. coli, deviating from the host-country standard requiring Salmonella and Shigella; a temporary deviation is pending
- ERR figures contradict between two verification reports: 21,189 (March 2026) vs 54,827 (September 2025), with no clear explanation for the ~61% difference
- Baseline is project-specific with no documented reassessment date, and the fNRB is sourced from a national default whose value is in dispute across documents
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2023 | 9,935 | 0 | 9,935 | |
| 2024 | 44,892 | 0 | 44,892 | |
| Total | 54,827 | 0 | 54,827 |
Risk Indicators
VVB-verified combined test
filter breakage documented
5% quantified deduction
Project-specific; fNRB in dispute
FPIC, grievance mechanism, benefit sharing documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →