GS11677 GS11902 Malawi Biomass Energy Conservation Programme CPA 15
GS-3929 ↗ · current registry ID: GS11915
#30of 1329 in Industrial#4of 92 in Malawi#97of 1801 in Gold Standard (GS)#10of 189 in AMS-II.G
Audit Analysis
A Gold Standard biomass cookstove project in Malawi with a VVB-verified investment additionality test, a 5% quantified leakage deduction, and no reported reversal events. However, the project-specific baseline, multiple data contradictions across documents (usage rates, crediting period, leakage justification), and the absence of a stated buffer pool or CORSIA/CCP eligibility status introduce moderate uncertainty. The verified ERR closely matches the claimed figure (99.6%), suggesting the VVB's verification is consistent with the project's claims.
Red Flags
- Crediting period contradicts between the monitoring report (2016–2025) and the validation report (2021–2036), creating ambiguity about the actual project duration and pro-rata expectations
- Usage rate verified differs between the monitoring report (0.9206) and the verification report (0.7678); the VVB's lower figure is privileged but the gap signals inconsistent measurement
- Leakage justification is stated as 'quantified' in the verification report but 'deemed negligible' in a 2024 appendix, creating uncertainty about the basis for the 5% deduction
- CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 42,830 | 0 | 42,830 | |
| 2022 | 31,061 | 621 | 30,440 | |
| Total | 73,891 | 621 | 73,270 |
Risk Indicators
VVB-confirmed investment test
EE project, no reversals reported
5% quantified deduction
Project-specific, reassessment not stated
FPIC, grievance mechanism, safeguards documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →